EFTA02641553.pdf
👁 1
💬 0
📄 Extracted Text (281 words)
From: Larry Visoski <
Sent: Monday, August 7, 2017 5:08 PM
To: Je vacation
Cc: Rich Kahn
Subject: Fwd: Paint VIP all shade
Jeffrey
Below is Rusty's comments from SAV engineering, Appears 520k to 535k if you can accept a single switch locate= at VIP
station for "All Shade Down/up"
From Rusty;
La=ry,
here is an excerpt of an email from the S=V Business office and some budgetary figures for the Shade control at the V=P
seat
"This will require a new switch pan=l and software mods to the CMS system. Estimate is $40k-$60k depending on
w=ether or not Gulfstream can find an existing RC panel, which would preclude=the custom design NRE.
If you're okay with a standalone swit=h under the ledge lid I should be able to shave more off the price point.
&=bsp;Estimate would be $20-$35k."
Let me know your thoughts =80 .
Rusty Cramer
Regional Sales Manager
South Florida</=pan>
Sent from my iPhone
Begin forwarded message:
<=r>
From: "Cramer, Rusty" < =
Date: August 7, 2017 at 1:02:39 PM EDT
To:
Subject: Re: Paint
4=lockquote>
Larry, here is an excerpt of=an email from the SAV Business office and some budgetary figures for the
Sh=de control at the VIP seat
"This will require a new switch panel and software mods to the CM= system. Estimate is $40k-$60k
depending on whether or not Gulfstream can f=nd an existing RC panel, which would preclude the custom design
NRE.=br>
EFTA_R1_01875611
EFTA02641553
If you're okay with a standalone switch u=der the ledge lid I should be able to shave more off the price
point. =Estimate would be $20-$35k."
Let m= know your thoughts....
apan>Rusty Cramer
Regional Sales Manager
Sou=h Florida
2
EFTA_R1_01875612
EFTA02641554
ℹ️ Document Details
SHA-256
8ec9ebf3258f2ea1b52a42cde2ae6834576c56985807e54de6a434a35091c5d3
Bates Number
EFTA02641553
Dataset
DataSet-11
Type
document
Pages
2
💬 Comments 0