EFTA00687942.pdf
👁 1
💬 0
📄 Extracted Text (176 words)
From: Daphne Wallace
To: Jeffrey Epstein <[email protected]>
Cc: ann rodriquez >, Rich Kahn
Subject: Fwd: FW: Little St James
Date: Wed, 13 May 2015 20:31:43 +0000
Attachments: LSJJ5-13-2015).pdf
Greetings Sir,
For your review and comments are the revised preliminary design drawings for the new Maintenance &
Workshop Building.
Respectfully, Daphne
Forwarded message ---
From: John P. Woods, AIA
Date: Wed, May 13, 2015 at 3:27 PM
Subject: FW: Little St James
To: Daphne Wallace < >, Cecile de Jongh
Daphne,
Attached is the revised preliminary design drawings for the new Maintenance & Workshop Building. Upon
approval, we will file it for the CZM Minor Permit. We will have to relocate the R.O. discharge tank as a part of
the work as its location is within the proposed layout.
JPW
Original Message
From: JAREDIAN DESIGN GROUP [mailto;
Sent: Wednesday, May 13, 2015 3:49 PM
To: John P. Woods
Subject: Little St James
JAREDIAN DESIGN GROUP
Architects, Engineers and Construction Managers 'E-mail
=Tax
This email is free from viruses and malware because avast! Antivirus protection is active.
EFTA00687942
ℹ️ Document Details
SHA-256
8efba583c8232c22e53e16ad28d406cea889d5d783cda1ee828028590654ee9d
Bates Number
EFTA00687942
Dataset
DataSet-9
Type
document
Pages
1
💬 Comments 0