EFTA00687942.pdf

DataSet-9 1 page 176 words document
👁 1 💬 0
📄 Extracted Text (176 words)
From: Daphne Wallace To: Jeffrey Epstein <[email protected]> Cc: ann rodriquez >, Rich Kahn Subject: Fwd: FW: Little St James Date: Wed, 13 May 2015 20:31:43 +0000 Attachments: LSJJ5-13-2015).pdf Greetings Sir, For your review and comments are the revised preliminary design drawings for the new Maintenance & Workshop Building. Respectfully, Daphne Forwarded message --- From: John P. Woods, AIA Date: Wed, May 13, 2015 at 3:27 PM Subject: FW: Little St James To: Daphne Wallace < >, Cecile de Jongh Daphne, Attached is the revised preliminary design drawings for the new Maintenance & Workshop Building. Upon approval, we will file it for the CZM Minor Permit. We will have to relocate the R.O. discharge tank as a part of the work as its location is within the proposed layout. JPW Original Message From: JAREDIAN DESIGN GROUP [mailto; Sent: Wednesday, May 13, 2015 3:49 PM To: John P. Woods Subject: Little St James JAREDIAN DESIGN GROUP Architects, Engineers and Construction Managers 'E-mail =Tax This email is free from viruses and malware because avast! Antivirus protection is active. EFTA00687942
ℹ️ Document Details
SHA-256
8efba583c8232c22e53e16ad28d406cea889d5d783cda1ee828028590654ee9d
Bates Number
EFTA00687942
Dataset
DataSet-9
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!