👁 1
💬 0
📄 Extracted Text (925 words)
To: brice gordo
From: Jeffrey Epstein
Sent Tue 3/6/2012 11:44:11 AM
Subject: Re: FW: Heavy Material
this is not right.
On Tue, Mar 6, 2012 at 6:58 AM, brice gordon ‹ > wrote:
Jeffrey
Rich is requesting your approval to purchase heavy material
we need this if we are to continue pours this week
do we have your approval for 38k heavy material
Forwarded messa e
From: Monique Harry
Date: Mon, Mar 5, 2012 at 10:20 AM
Subject: FW: Heavy Material
To: Brice Gordon
Cc: Rich Kahn , Thomas Melnick ‹ >
Brice,
Per your request total estimated cost for project needing aggregate on LSJ (Stone, Columbian
Sand, & Manufactured Sand) is $38,216.66. (Trucking included $6,561.00) Detail as followed
below.
Grotto 35 yards = $3,039.62
Flag Pole 75 yards = $6,521.17
Hell pad 40 yards = $3,178.92
Triangle 60 yards = $5,222.34
Sundial 10 yards = $667.89
Five Palms 65 yards = $5,901.28
Duct Bank 80 yards @ Five Palms including 3 add loads of MFS for underground work =
$11,502.72
Misc Pour 25 yards = $2,182.72
I can also provide the total dollar amount of sand, MFS, and stone per each job if needed.
MONIQUE HARRY
Project Administrator
LSJ, LLC
EFTA_R1_00224021
EFTA01839889
Telephone
From:
To:
CC:
Subject: FW: Heavy Material
Date: Wed, 22 Feb 2012 13:07:40 -0400
Rich,
Average of material used is based on type of concete mix. (ex. Devil mix dry, 4000 psi, grout
mix) This estimation is based on an average of 1500 lbs of stone per yard, 600 lbs of
columbian sand per yard, and 1200 lbs of Manf Sand per yard. (2000 lbs = 1 ton)
Per Tom's estimation below an approx 390 yards of concrete will be batched which breaks down
to:
293 tons of stone (requested 400 tons)
117 tons of Col (requested 500 tons)
324 tons of MFs (requested 500 tons)
Note: Material that is not batch which is taken by bucket or bakkcro is uscd in motar mix for
stone walls and concrete walls, dry repair of roads (holes), Lanscaping
MONIQUE HARPY
Project Administrator
LSJ, LLC
Tele hone
Fax
Date: Wed, 22 Feb 2012 10:40:53 -0500
Subject: Re: FW: Heavy Material
From:
To:
EFTA_R1_00224022
EFTA01839890
Monique ...good day ... a rough estimate of yards of concrete per project remember there
are approx 4000 lbs of materials in a yard of concrete..
1 grotto approx 35 yds to go
2 flag pole road 75 yds
3 hell road approx 40 yds
4 triangle approx 60 yds
5 sundial 10 yds to go
6 Five palms 65 approx 65 yds
7 duck bank ® five palms 80 yards + 3 truck loads ofMFS sand for underground work
8 misc pours approx 25 yds ...
that's all i have on the schedule for concrete placement at this time..
On Wed, Feb 22, 2012 at 10:01 AM, Monique Harry < 1.> wrote:
I need your help. Rich wants an estimate of how many tons will go to each one
of the projects below. 500 tons of columbian 500 tons ofMFs and 400 tons of
#57 stone.
MONIQUE HARRY
Project Administrator
LSJ, LLC
Tele hone
Fox
From: richardkahn12®gmail.com
Subject: Re: Heavy Material
Date: Wed 22 Feb 2012 09:22:58 -0500
To:
you had asked for 500 tons of each component
can you please allocate estimate of use for each project
thank you
Richard Kahn
HBRK Associates Inc.
301 East 66th Street, Suite 10F
New Yor NY 10065
tel
EFTA_R1_00224023
EFTA01839891
fax
cell
On Feb 21, 2012, at 8:15 AM, Monique Harry wrote:
Current Inventory:
Manufacturing Sand - 2 loads
Columbian Sand - 1load
Stone - 2 loads
Projects Concrete will be used for:
1. Five Palms - Side walks/terraces
2. Grotto - Steps
3. Flagpole pool - Road
4. Hell Pad - Road
5. Triangle - Road
6. Sundial - Slab
MONIQUE HARRY
Project Administrator
LSJ, LLC
Tele hone
Fax
Subject: Fwd: Heavy Material
From: richardkahnl2eamail.com
Date: Fri, 17 Feb 2012 16:01:24 -0500
CC: monioueharry hotmail.com
To: boordon.lsifThomail.com
Can you please provide me with inventory currently on hand in addition to specific details
on what this will be used for rather than mist island concrete
thank you
Richard Kahn
HBRK Associates Inc.
301 East 66th Street, Suite 1OF
New York. NY 10065
tel
fax
cell
EFTA_R1_00224024
EFTA01839892
From: Monique Har
Date: February 14, 2012 12:04:34 PM
EST
To: Rich
Subject: Heavy Material
Good Day Rich,
Attached for your approval 3 LS3 purchase request for Heavy Material
1. Manufacturing Sand 500 tons = $26,120.00
2. Columbian Sand 500 tons = $40,400.00
3. #57 Stone 500 tons = $18,360.00
Total = $84,880.00 (includes cost of Trucking)
Due to my absence on Friday and Monday, currently 3 loads of stone and 3
loads of Manf. Sand is being pick up at Heavy
Material without following the proper protocol.
Estimated cost is $6,200.00 so, I'm hereby
requesting $6,500.00 to be place on our
account to cover the cost.
MONIQUE HARRY
Project Administrator
LSJ, LLC
Tele hone
Fax
Brice Gordon
Little Saint James
EFTA_R1_00224025
EFTA01839893
USVI
Phone:
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA_R1_00224026
EFTA01839894
ℹ️ Document Details
SHA-256
8f22235ca5b0c81f3285aed66530da72e66f1510987f0b9e04f9832b6cf06c00
Bates Number
EFTA01839889
Dataset
DataSet-10
Type
document
Pages
6
💬 Comments 0