👁 1
💬 0
📄 Extracted Text (763 words)
From: Richard Kahn
To: Jeffrey Epstein <[email protected]>
Subject: Fwd: GSJ Storage
Date: Sat, 27 Oct 2018 13:20:17 +0000
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue, 4th Floor
New York, NY 10022
tel
fa
ce
Begin forwarded message:
From: Brian Prosolar <
Subject: Re: GSJ Storage
Date: October 27, 2018 at 9:18:26 AM EDT
To: Richard Kahn <
It's been stated repeatedly that the storage portion is the issue and all other components are performing as
designed and intended.
My conversation with Mr. Epstein indicated as such and our continued efforts have shown this to be the case.
In fact, the recent exchanges are principally driven by the report in which we've found 30% of the Aquion
battery stacks have failed.
Our conversation the day before yesterday was also centered around storage composition.
Additionally the warranty you refer to is specific to the Aquion batteries, if we are using the final invoice as the
contract.
Brian Walden
ProSolar America, llc
Director of Operations
c.
On Oct 27, 2018, at 8:51 AM, Richard Kahn < > wrote:
its very simple brian. we paid you for a working system. you have the obligation to replace fully at your
cost as it never worked properly from day one. the addtional money we paid for your attempts to fix will be
added to any litigation claims plus damages of course. So as to be crystal clear again: The total expense to
replace the system is yours and yours alone. If you want to send us a check for all money paid to you to date
EFTA01018383
including purchase and maintenance that could be an alternative.
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue, 4th Floor
New York NY 10022
Tel
Fax
Cell
On Oct 27, 2018, at 8:07 AM, Brian Prosolar < > wrote:
Good Morning Richard,
Last night I received another response, this time using a Lithium Ion battery.
We are currently revising our contract and estimate template so please consider this a "turn key" quote for
the storage component of the generation and primary distribution system. If you decide that this is the
configuration you wish to move towards, a formal quote and contract will be finalized.
The lump sum cost to replace the Aquion salt water batteries with a 300+kwh Lithium Ion composition
storage system is $410,205.28. This includes all integration and communications for a "turn key" product
with a 3-4 month lead time. The Tesla PowerPack is an option that is considerably less per Kwh but the lead
time is unknown and has been discussed as a year or longer.
In an effort to ensure we are interpreting the warranty of the Aquion system to your satisfaction, please share
your thoughts. The invoice that was relayed used language copied from Aquion literature and states 5 years
3 years prorated. We want nothing more than to foster a good relationship and, without admission of
culpability, are attempting to stand by the manufacturers claim.
Regards,
Brian Walden
Director of Operations, USVI/ BVI
Prosolar America, Lk.
On Fri, Oct 26, 2018 at 12:36 PM Richard Kahn wrote:
brian just to reiterate, you warrantied a system and we are not interested in offsets. you told me earlier
this week we would receive a proposal.
please be advised that there will be significant damages added to our claim if you think this is the way we
need to go..
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
tel
fax
cel
EFTA01018384
On Oct 26, 2018, at 12:14 PM, Brian Prosolar < > wrote:
Morning Richard,
I'm awaiting a vendor response concerning a Lithium Ion storage option but have received some
preliminary information I'd like to share.
There is a Nickel Iron battery option which has been the mainstay for the the NIssan Leaf and other
electric vehicles.
This has a 30+ year life expectancy (11,000 Cycles @ 80% depth of discharge) and is compatible with
all of the supporting infrastructure i.e. SMA inverters. chargers, etc.. Unfortunately there is a 4 month
lead time for delivery.
The initial "turn key" cost analysis for this system is $347,958.00. This is prior to any offsets.
I'll continue to pursue options but appreciate any feedback as we move forward.
Regards,
Brian Walden
Director of Operations, USVI/ BVI
Prosolar America, Lk.
Brian Walden
Director of Operations, USVU BVI
Prosolar America, L1c.
Prosolar Systems
Caribbean: 340-201-4752
Florida: (888) 462-5005
Let's Get Social
--L bL bL bL ti
Prosolar Systems
Caribbean: 340-201-4752
Florida: (888) 462-5005
Let's Get Social
GWLbL:',
EFTA01018385
Prosolar Systems
Caribbean: 340-2014752
Florida: (888) 462-5005
Let's Get Social
EFTA01018386
ℹ️ Document Details
SHA-256
8f4286c00455f85a981260a62b930bd884677ece196b3638978ba52d1a1eac89
Bates Number
EFTA01018383
Dataset
DataSet-9
Type
document
Pages
4
💬 Comments 0