EFTA00612232.pdf

DataSet-9 1 page 369 words document
👁 1 💬 0
📄 Extracted Text (369 words)
2119/12 Atlanta Refrigeration Service Quote ARS Export Supply V .R \ \.) "TY , Formerly Atlanta Refrigeration Service VI 7350 Estate Bovont, Suite 121C, St. Thomas USV1 00802 Tel: 340.775.9222 Fax:340.775.9122 QUOTE Jab Location Quote Information Little Saint James Data: Jul 30, 2012 Little Saint James ARS Quote ION: 9828862 St. Thomas, VI 00802 Submitted By: Kent Magee Original AMIna: Tel.: 340- 775-2525 Fax: . Submitted To: Brice Gordon Origlne Cell Date: 6/15/2012 We Submit Specific and Estimations for the Listed Below: IIEquipment Chiller todelEk 'Manufacturer: Carder Halt Description of Work Required: The following is a quote for the chiller In the library. We are proposing to return to site and remove the old chiller system. We will install the new airtiandler, chiller, reheat system, controls and dampers. The Controls installed will what was provide by EMS. The chiller will have a E-Coating on the condenser coil to resist corrosion. We will also provide a spare chiller to keep on site in case a replacement is needed. The new system will control the humidity of the library and control temperature properly. Shipping is included to St thomas. Barge must be provided for equipment to get out to LSJ. The use of the on site lull must be provided also for unloading container and getting equipment into place and removing the old equipment. Thank . you for choosing ARS Export Supplyl Pal foriess r.:...i ptitn Otv IVA Canter Complete Chiller System 1.0 $48,501.20 Spare Carrier Chiller 1.0 $26,550.00 D0C Controller. Controls and installation 1.0 $29,348.00 Duct work, Dampers, Materials 1.0 *845.00 MI Piping, Vales, Hardware 1.0 $3,660.00 :that Installation Labor 1.0 $14,500.00 . Important Notes: Total Materials: $110,924.20 i Lead time is 10-12 weeks depending on Manufacture lead time on equipment. Once Total E.P.A. I approved 50% is due before any equipment will be ordered. Once equipment antes, Total Misc./Welding: 25% will be due before installation work can begin. Once project is complete and I ;tinning anal 25% will be due. Total Labor: $14,500.00 Initial Call: Shipping/Freight: $4,500.00 Warranty Information: Subtotal: $129,924.20 i Manufacturer parts warranty and 30 day labor warranty on work performed Tax: Total: $129,924.20 FAX SACK SIGNED TO 340-775-9122 . Aumenidradon CNN Authorization: ARSAcceptance: emeeillog.00mIdokluoteViewndit9828862 112 EFTA00612232
ℹ️ Document Details
SHA-256
94fb03af87bfedb072402291f89f8cdc9183dc92dd98a1d98c6c0e84a28f0695
Bates Number
EFTA00612232
Dataset
DataSet-9
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!