EFTA01047607
EFTA01047613 DataSet-9
EFTA01047616

EFTA01047613.pdf

DataSet-9 3 pages 460 words document
P17 P19 V16 V11 D4
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (460 words)
From: Richard Kahn To: "jeffrey E." <[email protected]> Subject: Fwd: Great St. James Proposal Date: Tue, 02 May 2017 21:28:19 +0000 Attachments: Great_StJames_Bid-Manual.pdf; GSJ_Diagram_2.pdf; GSJ_Diagrami.pdf; Great_St._James_Bid-Automatic.pdf attached are quotes from September for switch gear GSJ i will review and then call Hugo for a better understanding of what is needed Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York NY 10022 tel fax cell Begin forwarded message: From: Richard Kahn Subject: Fwd: Great St. James Proposal Date: May 2, 2017 at 5:21:54 PM EDT To: Rich Kahn Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 tel fax cell Begin forwarded message: From: Hugo Hodge < Subject: Fwd: Great St. James Proposal Date: October 12, 2016 at 11:01:43 AM EDT To: Richard Kahn EFTA01047613 Good morning Mr. Kahn, I haven't heard back from you so Pm re-sending the email below. HH Forwarded message From: Hugo Hodge Date: Wed, Oct 5, 2016 at 2:54 PM Subject: Fwd: Great St. James Proposal To: Richard Kahn .5 Good Afternoon Mr Kahn, The attached proposals that I received from Bryan's Electric meet the bid requirements as requested in the design for this project. There were two options submitted for review. The options are as follows: I. Manual Switch Option Includes: • (2) Riser pole Fault Interrupters • (2) Primary Pad-mount Meters • (2) S&C Switches (Manual Operation and Isolation) 2. Automatic Switch Option: • (2) Riser pole Fault Interrupters • (2) Primary Pad-mount Meters • (2) S&C Switches (Automatic Operation and Isolation) I recommend the automatic option as this option is much more reliable than the manual option. This will offer more flexibility for outages on one of the two distribution circuits connected to the LSJ/GSJ distribution network as designed. The manual option will work but the switches will have to be operated manually and according to which island staff resides may be a big factor in restoration time. The automatic option will restore service in within seconds once one of the distribution circuits from WAPA experiences a loss of voltage. This option will also restore the network back to normal once the voltage returns and is stable. Please let me know if you accept this recommendation as well as your reaction to my recommendation on the submarine cable. We should also discuss who will notify the bidders of the decision. Additionally, providing these recommendations satisfies milestone number 3 of our agreement. Best Regards, Hugo Hodge Jr President and CEO HKT Energy Consulting Group, LLC EFTA01047614 Forwarded message From: Danielle Johnson -4 Date: Tue, Sep 27, 2016 at 2:21 PM Subject: Great St. James Proposal To: Hugo Hodge Good Afternoon Mr. Hodge, Please see attached proposal for your review. Kind Regards, Danielle Johnson B an's Electric EFTA01047615
ℹ️ Document Details
SHA-256
950eaca94918e71da86b2ebf413d9dbd7a51099624c17cebf10d4ea9981906c0
Bates Number
EFTA01047613
Dataset
DataSet-9
Document Type
document
Pages
3

Comments 0

Loading comments…
Link copied!