EFTA00593417.pdf

DataSet-9 1 page 172 words document
👁 1 💬 0
📄 Extracted Text (172 words)
EFTA00593417 LSJ Cistern Repair Estimate Crew Average Cost! Material Labor Crew Labor Subcontractor!E Description of Operation OW Unit Unit Cost Hours Rate Cost quipment Rental Total Cistern # 1 1 ea S1,080 62 $35 $2,170 $150 $3,400 Cistern # 2 1 ea S900 62 $35 $2.170 $150 $3,220 Cistern # 3 1 ea $480 42 $35 $1,470 $150 $2,100 Cistern # 1 outside wall coating & repair 1 ea $350 24 S35 5840 _S1.190 L Allowance for crack repair after cisterns are drained & inspected: # 1 Is leaking and will be repaired with hydraulic cement before coating 1 $350 24 $35 $840 $840 g Material delivery to Red Hook 1 ton $250 $250 $250 SUBTOTAL $11,000 20% OVERHEAD AND PROFIT 2.200 TOTAL 13,200 (1) Assumes all cisterns are fully d ained by onsite crew (2) Assumes onsite trash disposal (3) Assumes all transportation supplied by LSJ (4) This quote is good for 30 days (5) Upon Notice to Proceed, 100% material & 50% labor deposit required. (6) Balance due upon completion.
ℹ️ Document Details
SHA-256
954414dfab7d7c1c0f085eec074fafca331fc49b1fab31c4c047a9c8ca9ef23f
Bates Number
EFTA00593417
Dataset
DataSet-9
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!