MITCH102A / 19 W 31st Street. NY 05/25/2018 GRANT Engineering
Non-Conformance Log 139 Fulton Street, Suite 907
New York. NY. 10038
_NCR Log
# DATE MEMBER SIR Reference # COMME
01 T612017 First floor dock behind Contractor installed dock and placed concrete without informing the inspector. No inspection was
MITCH102A 20170306 EM Closed
elevator core - - performed. Contractor to get approval by EoR/RA for as-built conditions
Cellar and First floor Lobby Deck installation and placement of concrete was placed without inspection. Contractor to get approval by
02 31812017 MITCH102A 20170308 EM Closed
area - - EoR for as-built conditions
03 atioi2o17 Member size changes MITCH102A_20170310_O1" Some beam sizes different that shown in draws. EoR-to-iletine-ceurse-ei-astien Closed
Post connected to wall with
04 3./10/2017 MITCH102A_201703I0_OP Drawing call for min. 3 rows. EoR to define course of action Closed
2 clips
05 a/ 0/2017 No shop drawings on Site MITCH102A_201703I0_OP No shop drawings with detail of connections and members. EoR to approve field solutions Closed
Not approved fireproofing product was used on exposed steel at cellar. Contractor to get specs
06 3122/2017 Cellar Level MITCHI02A_201703228- EM Closed
and approval from AoR for fireproofing material used at exposed steel
07 3./22/2017 Cellar Level Concrete Pour MITCH102A_20170322A_EM Not approved dwgs found on site for pour at the cellar level. Contractor to get directions from EoR Closed
Changes in connection. Grout not used at connections with bolts. Sketch on site has no stamp.
08 3/29/2017 Steel frame stair connection MITCHI02A_20170329A_EM Contractor to get approval for changes from EoR on a stamped dwgfSketch before placement of Closed
concrete
Rebar installation and connection details for steel. Contractor to get approval for from EoR brfore
09 3./3112017 Rebar E-102 MITCH102A_20170331_EM Closed
concrete placement
10 4/3/2017 SK-05 rebar MITCH102A_20170403_EM No stamp on drawings. Contractor to seek stamp from EoR Closed
II 4/32017 S-105 Rebar MITCH102A_20170403_EM No details found. Grant to reinspect after dnvs are on site Closed
Sk-05 Landing for cellar
12 4/3/2017 MITCH102A _20170403 EM Shop Drawings used must be stamped by FOR Closed
steel stair
Changes to the stair design do not reflect on arch dwgs. Railings and step height does not conform to
13 4/32017 Steel Stair MITCH102A_20170403_EM drawings. Height of step is 8.06' and not 7.1/2" as per approved sketch. Contractor to provide updated Dosed
approved architectural dwgs
Connections at Steel Stair As-built connection details not reflected on plans. Approved sketch on 03130/17 and E-102. Contractor to
14 4/312017 MITCH102A_20170403_EM Closed
from Cellar to First Floor provide updated approved architectural dwgs
EFTA00805551
MITCH102A / 19 W 31st Street, NY 05/25/2018 GRANT Engineering
Non-Conformance Log 139 Fulton Street, Suite 907
New York. NY. 10038
Mechanical: Connection of Connection detail and size of ductwork could not be verified. No approved drawings on site. Contractor
15 4/5/2017 MITCH102A 20170405A EM Closed
ductwork to unit _ — to provide updated approved architectural dwgs
Mechanical: Duct Work Spacing of ductwork hangers not yet verified. No drawings on site. Contractor to provide approved
16 4/5/2017 MITCH102A_20170405A_EM Closed
Hangers Min architectural dwgs
Performing of avrg required thickness for fireproof material as per requirements of structural members.
Density test performed.does not conform to min. Required (15pcf) per specs of approved products
17 7/18/2017 Cellar Fireproofing of Steel MITCH102A_20170718A_EM Closed
reflected on plans. Approved sketch on 03/30/17 and E-102. AoR to provide directions. Contractor to
send to inspector approved thickness for structural members
EFTA00805552
ℹ️ Document Details
SHA-256
970d685b506eac2e86a34abebd10bb953f5334e2c549e76781cbab86174e9572
Bates Number
EFTA00805551
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0