📄 Extracted Text (237 words)
Dominik Ziewiec 9E. 71 STR.
Sept 16. 2008.
Attn: Richard Barnett
INVOICE 08
4th floor YOGA ROOM, YOGA CLOSET AND BATHROOM
SCOPE for Yoga room:
- Protection of work area.
- Preparation of the cracks on the ceiling.
- Plaster work.
- Primer work.
- Sanding work (to smooth the surface).
- Repainting to match existing color (BM flat off white).
- Cleaning and removing debris from the area.
SCOPE for woodwork
- Preparation of the woodwork.
- Primer work.
- Sanding work (to smooth the surface).
- Repainting to match existing color and furish.(oil base)
- Cleaning and removing debris from the area
SCOPE for Yoga Closet :
Ceiling and Walls
- Protection of work area.
- Preparation of the cracks on the ceiling and walls.
- Plaster work.
- Primer work.
- Sanding work (to smooth the surface).
- Repainting ceiling to match existing color (BM flat ,off
white).
Repainting walls to match existing color (BM flat.)
EFTA00606405
- Cleaning and removing debris from the area.
SCOPE for woodwork :
Preparation of the woodwork.
- Primer work.
Sanding work (to smooth the surface).
Repainting to match existing color and finish.(oil base)
Cleaning and removing debris from the area.
SCOPE for touch up Bathroom :
- Protection of work area.
- Touch ups.
- Cleaning and removing debris from the area.
Total amount due : $ 8600.00
APPROVED (
,fra-4.0
SEP 17 2007
RICHARD BARNETT
EFTA00606406
ℹ️ Document Details
SHA-256
977d9aab5fe49f7c5d722f25c47ef30975fe73ef6484f8237e9353e0531bd458
Bates Number
EFTA00606405
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0