To: [email protected][[email protected]]
From: MIE
Sent: Wed 2/19/2014 7:59:03 PM
Subject: Fwd: JEGE 908JE
JEGE C check 2-19-14.xls
Jeffrey,.
this is the quote I fwd to Rich to review,. I wanted to share with you also,.
this does not include cost for #1 and #3 engine inspection,. that estimate will follow later this week for Miami Gas
Turbines,.
Gary is working a buyer with AS IS quote before we start inspection,. long shot, but its possible,. should hear
back by end of week,.
thx
larry
---Original Message---
From: Scott Stambaugh
To:
Cc:
Sent: Wed, Feb 19, 2014 10:23 am
Subject: RE: JEGE 908JE
Attached is the pricing for the c check and all ADs. I will put together the pricing for the
additional items Glenn sent and forward that on.
Below is the pricing for the SB kit for compliance with AD 2009-05-03 (SB 727-28A-0128 fuel
boost pump GFI relays). These materials for the GFI kit are not in the C check number in the
bid. We have completed about 13 of these modifications already and have the long lead time
parts in stock. So we won't have any lead time issues.
Part Number Description Cost per QTY Total
65C38468-15 TOP KIT $25,900.00 1 $25,900.00
KDAG-X4F- GFI RELAYS $2,880.00 8 $23,040.00
001
61-12905-51 SUPP.HARDWARE $225.00 1 $ 225.00
KIT
BACC45FN24- CONNECTOR $69.00 3 $207.00
43P6
BACC45FN24- CONNECTOR $72.03 3 $216.09
43P9
BACC45FN24- CONNECTOR $72.03 3
43P10 $216.09
EFTA_R1_00388426
EFTA01934469
From: mailto:
Sent: Monday, February 17, 2014 10:22 AM
To:
Subject: Fwd: JEGE 908JE
Scott,
Please see Glen's additional items to get 908JE through to it's next "C" check after this one.
Larry
---Original Message—
From: Glen Webb
To:
Sent: Thu, Feb 13, 2014 1:03 pm
Subject: RE: JEGE 908JE
Hi Larry,
I've attached a report listing those items that will not make it to the next check in Feb 2016. These are
items that can be done during the 2A next year or done at Stambaugh as an AWR. Everything else is in
the package I already put together.
Glen
From: mailto
Sent: Thursda Februa 13 2014 10:14 AM
To:
Subjec :
Hi Glen,
Can you please build me an updated maintenance package for 908JE. Let's look at cleaning it up for24
months if we don't get into anything additional major. We are going to do the no.1 and 3 engines at this
time as well.
Mike Miejer will be contact you for engine information on the 1&3 . It is OK to forward whatever he
requests. Looks like the Boss is willing to dump some money back into the Ole girl.
Call me with any questions or to discuss the package. The aircraft will be going to Stambaugh within the
next week.
Larry
EFTA_R1_00388427
EFTA01934470
ℹ️ Document Details
SHA-256
97ada642c7dbf655c3f4248189a23ff9924f12c59333a5c232649afe737b9fdc
Bates Number
EFTA01934469
Dataset
DataSet-10
Type
document
Pages
2
💬 Comments 0