From: Jeffrey Epstein <[email protected]>
To: Marc Dober
Subject: Re: Construction questions
Date: Tue, 29 Nov 2011 19:05:49 +0000
this also shows that the railing paint info was given to you only hours after you asked me„ , but you did't tell.
me,? send me bans phone contact info thanks„ what about toms access problems. ? did you discuss it with
him/
On Tue, Nov 29, 2011 at 1:56 PM, Marc Dober > wrote:
Here is the email from Tom
Begin forwarded message:
From: thomas melnick
Date: November 21, 2011 2:18:23 PM EST
To: mark < >, Brice Gorden
Subject: RE: Construction questions
#12 should that be the beach cottage Paul Ferreras plans ....Nov 10th dwgs ???
#2 we have started the form stripping process and have the mason on line for monday the 28th , to erect
the 2nd lift of cmu units to beam elevation... once that is done then we start the forms for 2nd lift of concrete
work approx 12/14 pour date ,then roof trusses on 12/20 ..so we are not stopping on the exterior shell of the
building ..I hope to have the building roof dried in by Jan 5th
# 8 starting temp enclosure through bathroom access per request
# 9 replaster in 5 days...???? how much of the existing are going to remove ....we also have access problems
for this area ...we should have a pre plastering mtg first...
#10 working on column design now ....
#11 working on clearing this area right now ....for layout when jeff gets here
# 1 railings and painting are done ...
From:
To:
Subject: FW: Construction questions
Date: Mon, 21 Nov 2011 13:54:53 -0500
Please review to see if I am missing anything
Thanks
Marc
EFTA00924736
From: Marc Dober [mailto:
Sent: Monday, November 21, 2011 11:44 AM
To: Jeffrey Epstein
Cc: thomas melnick
Subject: Construction questions
Jeff,
Here are most of the construction questions:
I. Need a decision on the dock house railing paint color
2. Tom needs to get architectural drawings and final design for 5 palms. He will be back in this area during
your visit and we need some direction there or we will need to stop.
3. Flagpole — sent many pictures with the walls painted — do you still want to raise the gates to hide area all
together.
4. Flagpole — do you want a gate on the lattice box — there needs to be access to the back equipment room
5. Flagpole — what landscaping do you want along the lattice wall that faces the road. You originally
wanted ficus but please confirm
6. Do you want us to finish the wall to the info center? We are 95% complete
7. Palm tree placement on big hill — the new measurements are - the distance from the wall to the line, is
13'6" which is 8'6" closer to the wall than the last line which was 22 feet from the wall. The "new line" is a
line made by Shane the surveyor and myself based on your request to have a line "level with the foundation
of the Cabana 4 wall" . Please confirm
8. Gym renovations — need a scope of what you want done here.
9. Flagpole pool — sent you an email on proposed schedule to re-plaster. Basically he said he can be in and
out in 5 days once all material is on island. 5 days does not seem logical here.
10. Dock shelter- all the material for the dock shelter is on island. We need a design to get started.
11. New Helipad — when do you want to do this so I can get it scheduled with Tom.
12. Staff cottage — we need a full set of plans and architectural drawings. Tom can't build off what we have
been given.
Thanks
EFTA00924737
Marc
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA00924738
ℹ️ Document Details
SHA-256
9805f915e5506bb0327ddf6e84fe4ad6df6ad4f35af10eb4dd5a67ae47d74060
Bates Number
EFTA00924736
Dataset
DataSet-9
Type
document
Pages
3
💬 Comments 0