EFTA01026883.pdf

DataSet-9 8 pages 782 words document
👁 1 💬 0
📄 Extracted Text (782 words)
From: Richard Kahn To: Jeffrey Epstein [email protected]> Subject: Fwd: LSJE Steel Building Project - December 12, 2018 Date: Tue, 15 Jan 2019 21:13:16 +0000 Attachments: 3_attch_bldngs_USVI_St.pdf Inline-Images: image001.png; image002.png; image003.jpg i will call vendor tomorrow to review additional questions such as time frame, shipping, paint colors, etc.. Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York NY 10022 Begin forwarded message: From: Kyle reavis < Subject: Fwd: LSJE Steel Building Project - December 12, 2018 Date: January 15, 2019 at 1:30:24 PM EST To: Daphne Wallace < >, Richard Kahn < Revised header Forwarded message From: Mike Stock < Date: Tue, Jan 15, 2019. 11:50 AM Subject: RE: LSJE Steel Building Project - December 12, 2018 To: Kyle reavis Please see attached. All the best, ~jallied Steel Buildings EFTA01026883 Mike Sock Senior Account Manager I International www.alliedbuildings.com http://www.alliedbuildings.com/terms/ https://twitter.comiAllied Stock T. F S https://twitter.com/Allied Stock From: Kyle reavis [mailto: Sent:Tuesday, January 15, 2019 11:24 AM To: Mike Stock Subject: Re: LSJE Steel Building Project - December 12, 2018 Mike, Please correct the heading for us, showing USVI and St thomas, not SW. Thank you! And it looks great! Kyle On Mon, Jan 14, 2019 at 4:41 PM Mike Stock < wrote: Hi Kyle, We completed an initial design and attached is your preliminary proposal. Please review the information and contact me with any questions. EFTA01026884 All the best, let:Allied Steel Buildings Mike Stock Senior Account Manager I International www.alliedbuildings.com bitp://www.alliedbuildings.com/terms/ https:fitwitter.cornAllied Stock bups.//twittercem/Allie_d_agris From: Kyle reavis [mailto ] Sent: Monday, January 14, 2019 6:54 AM To: Mike Stock cMla Cc: Daphne Wallace ca. Richard Kahn •cc > Subject: Re: LSJE Steel Building Project - December 12, 2018 Mike, Please let me know where we are with pricing. Thank you! Very Respectfully, Kyle Reavis On Thu, Dec 20, 2018 at 2:56 PM Mike Stock < > wrote: Hi Kyle, EFTA01026885 I'm working on a preliminary design for your building we discussed. Pricing won't be ready until after the new year, but I want to make sure what I'm working on is what you have in mind. All the best, ,Allied Steel Buildings Mike Stock Senior Account Manager I International www.alliedbuildings.com http://www.alliedbuildings.com/terms/ https://twitter.comiAllied Stock EFTA01026886 https://twitter.com/Allied Stock From: Kyle reavis [mailto Sent: Thursday, December 13, 2018 6:50 AM To: Cc: Daphne Wallace < ; Richard Kahn < Subject: Re: LSJE Steel Building Project - December 12, 2018 Hey Mike, I do not have elevations here. I am thinking the building will be around 22-25' tall to include the office sections in each shop. The potential site will be graded to keep the whole building level with no changes in foundation elevations. Lets do 2 pm if that works with you, I am on STT time if you are on EST time let me know. Thank you Mike and I look forward to it. Kyle Reavis Construction Manager On Wed. Dec 12. 2018 at 3:58 I'M Mike Stock wrote: Hi Kyle, I received your email. Do you have any elevation drawings? I'm available tomorrow late morning between 10:30-12 or between 2-3pm All the best, EFTA01026887 ; ;,,Allied Steel Buildings Mike Sock Senior Account Manager I International www.alliedbuildings.com http://www.alliedbuildings.com/terms/ tittosiltwitter comtAllied Stock https://twitter.com/Allied Stock From: Kyle reavis Sent: Wednesday, December 12, 2018 2:39 PM To: Cc: Daphne Wallace <I I>, Richard Kahn Subject: Re: WE Steel Building Project- December 12, 2018 Mike, Please take a look at these prelim drawings / design concept. I will give you a call tomorrow to review, what time is good for you? Kyle On Wed, Dec 12, 2018 at 3:26 PM Mike Stock < > wrote: Thank you for the introduction Daphne and I enjoyed catching up with you. I look forward to reviewing the design and assisting your team. EFTA01026888 All the best, ,,Allied Steel Buildings Mike Stock Senior Account Manager I International www.alliedbuildings.com http•//www.allipdhuildings.comlterms/ httpsittwitter.cornAllied Stock https://twitter.com/Allied Stock From: Daphne Wallace [mak° Sent: Wednesday, December 12, 2018 3:11PM To: Mike Stock Kyle reavis •c >; Rich Kahn Subject: 151E Steel Building Project - December 12, 2018 Greetings Mike, It was a pleasure talking to you this afternoon. As promised, I am using this email to introduce you to our Project Manager Kyle Reavis, who has been working with our Principal on designing a building that will house offices and storage for the various departments that run his islands. Kyle, Mike Stock is the Senior Account Manager of International Sales of Allied Steel Buildings. www.alliedsteelbuildings.com EFTA01026889 When you have a chance please forward your drawings to Mike, with any comments, questions, and requirements you note, so Mike can review and prepare a quote for you. Mike's Direct contact number Thank you and kind regards, Daphne EFTA01026890
ℹ️ Document Details
SHA-256
997b8eae49c92b9f4e1d2e676b906eabcd45bb3bff3e20b1ba4fea533f21979a
Bates Number
EFTA01026883
Dataset
DataSet-9
Type
document
Pages
8

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!