EFTA02435127
EFTA02435129 DataSet-11
EFTA02435131

EFTA02435129.pdf

DataSet-11 2 pages 245 words document
P17 V16 P19 V11
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (245 words)
To: Jeffrey Epsteinfleevacation@gmaitcom] Cc: From: Eric Roth Sent: Tue 11/10/2009 10:22:44 PM Subject: S76 Interior image001.jpg Dear Jeffrey, I spoke with Larry and he said that you expressed concern with regard to the upholstery details. Please note the following steps: Sikorsky will conclude their testing of the Confor foam and make a recommendation to us for the build up. We will build a section of the cushions incorporating the Confor foam in a manner that will adhere to the overall dimensions we discussed in detail at your home. After you approve the foam build up, we will then build the production cushions. During the production cushion build up phase, we will contact you to discuss the opportunities for your input with regard to dimensions (and most certainly the "arch" on the back cushion) as well as the arm rests and curve from the backrest into the arm rests outboard. Either way, please take comfort knowing that we will not even pull out the bolt of fabric until you visually approve the foam design. Please do not hesitate to call me if you have any questions. Once we receive accurate direction from Sikorsky on the foam build up we can produce the sample foam cushions — I am hoping to be in a position to send them out at the end of next week. This aside, everything looks absolutely beautiful! Have a good evening. EFTA_R1_01507030 EFTA02435129 Snice ly. Eric Roth President International Jet Interiors EFTA_R1_01507031 EFTA02435130
ℹ️ Document Details
SHA-256
9a3092add85efb6fa79781483fb6aa5d868a6c2fd8ca7e7345966abcaa1302a1
Bates Number
EFTA02435129
Dataset
DataSet-11
Document Type
document
Pages
2

Comments 0

Loading comments…
Link copied!