EFTA01799185.pdf
👁 1
💬 0
📄 Extracted Text (695 words)
From: Larry Visoski
Sent: Tuesday, March 22, 2016 4:30 AM
To: Je vacation
Subject: G550 update
Jeffrey
Pete will have more detail comment by lunch time Tuesday, Appears the aircraft has time sensitive items due„ 0=
bottles Hydrostatic inspection,
</=iv>
I'm only guessing, but my gutt tells me, a=rcraft is un-airworthy at this time.
I would imagine this is the reason Kevin wants the pre-by inspection co=pleted at Chrysler Penistar in Pontiac Michigan,
where the aircraft sits, In order to accomplish your test flight, Kevin should have aircraft ma=e airworthy, we know the
144 month inspection is due June 2016.
I would im=gine a 144 month could be our prebuy, or is price based on simplified prebu=? to include test flight,
borescope and records review?
I would imagine Ch=ysler Penistar could provide quote to make the aircraft airworthy, for=your test flight, and also
provide a quote for the 144 month inspection Even though Chrysler Penistar is not factor= Gulfstream, they are a very
reputable repair shop,
Notes from=Pete:
Hi larry,&=bsp;
Transferred from my written notes-
ACTT 2847.6, 1391 LDGS, A=U seems to be 2429.8 (there were some items regarding the work orders for s=me work
done, with an item to record APU times) These seem to be from a G=lfstream Facility, or is the aircraft at Pentastar?
They may use the same p=ogram.
Seems to have flown approx. 20 hours, and did 12 landings sin=e last June.
The CMP reports as from Today.
First, inspection due=times-
1A- Due calendar by June 2016
2A- 1000 hours, next due about 1=5 hours from now
4A- 2000 hours, due 1125 hours 'ish'
5A- 2500 hours,=due 1625 hours 'ish'
8A- 4000 hours due 1150 hours 'ish'
Ca=endar items:
1C - 12 Month
2C- 24 month
3C- 36 Month
4C- 48 Mon=h
EFTA_R1_00137672
EFTA01799185
6C- 72 Month
All of the calendar items are due in June, 2016
Fuselage penetration was done i= 9/2013. Big ticket item, but with plenty of time (72 Month?) FWD E-batt=discard due
7/2016
Note: All Customer frequency items have been take= off the due list- Because in long term storage?
That includes E-batt BI=E test and some other items.
Main battery Cap checks were due 2/2016= There were notes in the WO's for check battery voltage, but nothing for th=
Cap checks.
Defibulater pads were life limited due 3/2016, maybe remove= as a customer frequency item.
Gear corrosion inspections and reappl=cation of compound are due 7/2016- CMP shows 90 M/H for the mains and
40=M/H for the nose.
I'm not sure if that includes gear functional checks, a=d blowdown M/H's- I believe that is calculated in.
Gear blowdown bot=le is due Hydro 5/2016.
No leeway, DOT requirement-
There were so=e comments on the brake wear- They all seem to be original from CMP- =t looks like #2 was repaired, and
probably reinstalled.
There is a proce=ure to install a spacer disk to get more life on the carbon stacks.
I'm n=t that familiar with the life on the G-550 brakes, but would expect them to=have life left.
The Air Data Modules (ADC's to you and me) show havi=g a 12 month check due 3/2016.
It's not the 24 month Altitude/transponde= check, I'm not sure what it involves, but would be overdue.
2 Oxyge= bottles (main) are due hydro in September- a 5 year item.
They are due I=fe limit in September 2017- a 15 year requirement.
It doesn't make sense=to Hydro, then scrap after 1year.
The forward portable O2 is due Hy=ro 5/2016
Try to make some sense from these notes, and we will talk t=morrow- I expect that you will be at PBI around 11AM=/a>.
As for an Independent overview-
You may want to contact Dunc=n Aviation in Battle Creek to send someone- A total third party represen=ative for the
buyer- I'm sure that they would be more than willing, and e=pect them to quote you for the required inspections
afterwards!
FYI-=The Boeing Lay power supply was sent to Consolidated in LI for review of re=air.
Talk to you tomorrow-
I'll have a better idea on the status b= Lunchtime- Still pushing for Friday (PM!) RTS.
Regards,
Peteaspan>
Sent from my iPhone
2
EFTA_R1_00137673
EFTA01799186
ℹ️ Document Details
SHA-256
9bb01a78ed9f398e57a291c8d003ade939d2c2cc0f70f9c8dff00492020ff706
Bates Number
EFTA01799185
Dataset
DataSet-10
Type
document
Pages
2
💬 Comments 0