EFTA01022671.pdf
👁 1
💬 0
📄 Extracted Text (315 words)
From: Jermaine Ruan
To: Cecile de Jongh
Cc: LSJ Michael Glidden hard
Kahn , Kyle Reavis
, Daphne Wallace , Ann Rodriquez
, Jeffrey Epstein <[email protected]>
Subject: Re: Passing on information
Date: Tue, 18 Sep 2018 18:09:41 +0000
Will do.
On Tue, Sep 18, 2018 at 11:34 AM Cecile de Jongh > wrote:
Jermaine,
Please coordinate this around the Viya engineers' visit tomorrow at 10AM. Thanks.
With warm regards,
Cecile de Jongh
On Monday, September 17, 2018 05:14:05 PM ADT, Jermaine Ruan < MIIIM=> wrote:
Sure Wednesday is fine. Can we also talk about the RO run also so we can organize everything?
Regards
Jruan
Sent from my iPhone
On Sep 17, 2018, at 2:58 PM, michael glidden <-> wrote:
Hey Jermaine, just took a moment to look at this and need to say that it looks like a good piece of equipment but we don't
have any use for it on LSJ. That machine is designed for digging in dirt and we do not have much of that here on LSJ. We
Trench in rock out here.
When you have the time I would like for you and Ito go over our ideas for the new cabling between the gym and the
generator building. It would be best if you came out and saw what I will be referring to.
Wednesday would be good.
Let me know.
Thanks,
MG.
On Sep 12, 2018, at 10:02 AM, Jermaine Ruan wrote:
Good Morning All
Here is a picture of the trencher Sherwin just sent.
Regards
Jruan
On Wed, Sep 12, 2018 at 12:38 AM Jermaine Ruan < wrote:
Good Night All
EFTA01022671
Shemin Rey has informed me that he will have a trencher with 6" wide for installing conduits. He will be will to rent it out
with operator if needed. The unit will be on island in 4 to 6 weeks.
Regards
Jnian
<IMG_1784.jpeg>
EFTA01022672
ℹ️ Document Details
SHA-256
9ce56df1d170a099c615ae2cddd69ebbeca87e5ded9f28d485394346c96055c4
Bates Number
EFTA01022671
Dataset
DataSet-9
Type
document
Pages
2
💬 Comments 0