EFTA02307924
EFTA02307925 DataSet-11
EFTA02307927

EFTA02307925.pdf

DataSet-11 2 pages 901 words document
P17 P23 V16 V11 V15
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (901 words)
Punch List — May 12 2012 1. Flagpole Pool Cabana - - Recovering of sofa/chairs - to be completed via JE direction in May — project to commence 5/15 - Lighting - more down lights outside 2. Main Compound - - Landscaping — purchase goat's foot vine on hillside —investigating options/price forwarded 5/4 - Entry basket - purchase Bougainvillea (bright red); fill in front of basket with more dirt - repairing of coral stone deck areas - coral stone thresholds in guest rooms need to be cut 3. Five Palms —TOP PRIORITY - Trenching — in progress - Electrical/Phone/Data — reviewing in house option — pull boxes - Exterior Door Shutters - require JE approval - Interior Doors — install new glazing week of 5/21 - handles need to be large - Painting — final outside coat to be completed once all work is finished - Waterproofing - Furniture — X 2 cannonball lamps, bronze lamp— on site - Sofa — purchase - Rug — on site - will be cleaned before it is installed -= - Built in Cabinets/shelves — to be completed by Bill — hinges for cabinet doors on LSJ — work ongoing - Landscaping — level dirt - continuing — relocate grasses— continuing - Lights — outside light boxes on the mirror and shutter door side need to be covered - light parrots and building — from roof line (rectangular 24 X10) - sconces are the same as everywhere else - Desk — EDA on SU 5/15 - Mirrored siding — on LS1 5/9 — installation to begin week of 5/14 - Framed Photos —JE to review 4/30 4. Grotto - - Pavilion — painting in progress - white - Landscaping — more dirt required on left hand side as you look down, then hydroseed - Shutters/generator doors/storage doors — ??? - Genset wiring — scheduling to be determined 5. Hangar — - Concrete Floor— painting in progress - Painting — interior paint selected - Silver Polaris - from LSJ relocated to hanger, purchase new vehicle for LSJ 6. Steel Shed — ABC Concepts proposal forwarded to JE 4/24 — redesign in process 7. Triangle — needs to be reconfigured, with more dirt on top and less around base - more concrete required around edge - additional road 8. Entry Tree Lights — lights on site 9. Solutions for Generators — Sound proofing solution forwarded to JE, require direction 10. Top of hill — CLEAN UP — remove rocks - ongoing, and hydroseed EFTA_R1_01186870 EFTA02307925 12. Sunken Garden Berm — crusher runs - place inside berm area - 4 large planter boxes with small planter inside require construction — size to be determined by JE 13. Engineering — Clean Up — area needs to be leveled (Jules) and metal shed to be laid out - Landscaping — planting Sea grape 14. New vehicles — two more Polaris bikes (800's) - LarryM 15. Dock- - Entry — redo entry — Brice to source dock wood locally - Decking - discuss pressure treated timber/carpeting - Floating Dock — design required - Jet ski Docking - review - Table — final size/design to be determined — coral stone top — Bill - Old floating dock —moved to engineering, requires redesigning 16. Mooring Permit — estimate to place anchors forwarded to JE 4/10 - awaiting direction 17. Telephone system - remove/add speed dial - Jermaine on LS1 5/15 to complete with Danny Vicars 18. Gates - Thatch needs to be applied to lower gates - both to be painted - completed 19. Guest House at Beach 3 -- sited, needs to he roughed out - start after Five Palms 20. Kite House — review of wooden outside furniture 21. Chillax Room requires furniture piece for electrical/media equipment 22. Chilax Bathroom - requires blue rugs for bathroom & vanity ar - put weather stepping at a maumurn en, bathroom door (as it is flooded) or change swing with threshold 23. Mechanical Building - Replacement Transformer — approved to purchase— Rich K awaiting invoice to send wire 24. Boats - Midnight Express — 4/2 approved to purchase Yamaha 300 motors, to be installed by Offshore Marine - ship existing motors to FL, LV to sell — shipped 5/10, EDA in FL 5/14 - PRD— sell - Lady G — sell - Big N - sell - Calypso — refurbish 25. Sundial — 26. Hydro seeding —as much as possible especially when it rains 27. Gym Road - road material & holes in stone wall need to be added for water drainage — holes complete, road grading after Five Palms 28. Outside Master Bedroom — banana Plantation area requires tidying up — 4/30 - bedroom door to outside to be adjusted and lock added 29. Nautilus (Main courtyard) area - requires cement band to continue 30. Relocate Tom's Trailer — area to be used for employee bathrooms 31. Move beach trees 32. Compass — hydroseeded 5/9 33. Sombrero ramp - completed 34. Timers — review installing timers on air conditioners, irrigation water systems, and lights 35. Life vests— new life vests, yellow and black, in men's and women's sizes — at least 2 of each, if not knisez size so they can berenhatigekill= 36. Beach lighting - per JE, replace existing transformers for the beach lighting of palms around the salt pond and beach - fix large broken light *6ft grader -Jules EFTA_R1_01186871 EFTA02307926
ℹ️ Document Details
SHA-256
9d8678135640d40ba4de9bc8155085159cdbbf868a45d5b7b7b86b35febae978
Bates Number
EFTA02307925
Dataset
DataSet-11
Document Type
document
Pages
2

Comments 0

Loading comments…
Link copied!