EFTA00686375.pdf
👁 1
💬 0
📄 Extracted Text (299 words)
From: Marc Dober
To: Jeffrey Epstein <[email protected]>
Cc: ' >, thomas melnick
Subject: Re:
Date: Thu, 17 Nov 2011 14:23:39 +0000
The wall by the bench needed to have a sprinkler head moved and plants moved to accommodate the wall. That
will be done today. We did not want to disrupt the border on the tile so we are building the wall from the dirt
level up. Is that ok?
Mosaic light are not done as there is air ducts where the light s are supposed to do and Gary needs to do
measurements to see if there is enough room. He has been focusing on getting the relax room bathroom and
cabana 4 electrical completed.
Main engineering road not done yet, let me follow up with Tom on timing.
Let me check on the boulders
On Nov 17, 2011, at 9:39 AM, Jeffrey Epstein wrote:
i do not see the little wall at my bench outsdie by bedroom igala said it would be done the day after i left. .. did
ht lights above the mosaic , get done. the lights in the condors near the breezeway door.s// did the main road
get engineered yet. ? did jules store boulders nearby for the rip rap road on the service entry/library
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation®gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA00686375
ℹ️ Document Details
SHA-256
9e515c92410088d2adf2a2116da400e870d79f40d9c79d7c1de96a1f9b7984f0
Bates Number
EFTA00686375
Dataset
DataSet-9
Type
document
Pages
1
💬 Comments 0