EFTA00827410.pdf

DataSet-9 4 pages 801 words document
👁 1 💬 0
📄 Extracted Text (801 words)
From: To: Jeffrey Epstein <[email protected]> Subject: Fwd: ZDC EGP Wall Height Date: Mon, 16 May 2016 00:22:00 +0000 Attachments: Site Plan &_Cut Sheet 032216.pdf; IMG 2526.,TPG; IMG 2527.JPG; IMG_2528.JPG; IMa 25213.JPG; IMG 2330.,TPG; IMG 2511.JPG; IMG_2532.JPG; IMG 2533.JPG; IMG 2534.JPG; IMG:2535..1PG Attached email for your reference, I was informed this information was forwarded to you I will be forwarding plant material list/cost this week for final approval ssa e From: Date: Tue, May 3, 2016 at 12:29 PM Subject: Fwd: ZDC EGP Wall Height To: Rich Kahn Cc: ZDC Rich regarding this morning conversation about the Rock Wall proposal and the Bosses concerns I wish to confirm the following The Various Mockups shown to the Boss where constructed by Jose and his 6 crew, not by Zorro personal None of the existing crew have the skill set to construct walls of this nature, quality and in the required time frame As discussed with the Boss on his last visit, as wall section s are completed, Zorro Personal would be performing irrigation and planting. In the mean time they are working on the irrigation at Lodge, which will be completed this week Ranch Central Irrigation starts next week. Spring clean up and maintenance of all locations continues As stated I am having a hard enough time to find qualified people (legal) to pickup rocks, the one guy I have sourced was via Jose Regarding the construction of the walls Due to the small nature of the walls and the 4% grade the Walls are to be built on, Jose is recommending footing and glue to hold them in place. If the Boss feels this is not necessary, then Jose will construct walls with out support. Lastly if I felt comfortable self performing this to the required standard and time frame we would mostly certainly would. Please advise on how we are to proceed Regards Brice Forwarded message From Date: Tue, Mar 22, 2016 at 7:37 PM Subject: Re: ZDC EGP Wall Height To: "jeffrey E." <[email protected]> Jeffrey attached photos of wall 18W x I 2H EFTA00827410 also sketch ofnew lay out, the second page is for obtaining final grade. Rock guys have sketch and I should have there build cost by Thursday. regards Brice On Mon, Mar 21, 2016 at 8:14 PM, l> wrote: sorry for late reply, started commissioning new pump skid this afternoon. will lower wall tomorrow yes it is dry- stacked attached photo confirming On Mon, Mar 21, 2016 at 3:11 PM, jeffrey E. <[email protected]> wrote: take 6 inches off height, is this dry stack? On Mon, Mar 21, 2016 at 5:02 PM, wrote: Jeffrey attached photos of the first Wall Mock Up for your consideration Side Stacked using the existing block footing as an example, this would be the quickest method. The Dry-stack would have minor footing and no mortar, a lot more labor intensive and would use lot more material. The Dry-stack wall height 24w x 18h, One large dump truck load will do approx 40ft of wall which do you prefer, dry-stack or side stack On Sat, Mar 19, 2016 at 12:59 PM, Jeffrey E. <jeevacation®gmail.com> wrote: make some 10 foot long mock ups to see thanks On Sat, Mar 19, 2016 at 1:49 PM, wrote: Jeffrey Attached drawing for your consideration Can you please confirm the wall heights, 24W x I 2H for outer mowed grassed areas 18W x I 8FI for middle beds stipa grass areas 18 W x 24H for center bed with trees and lavender bed. Is this OK? Stanley, NM Ph: (505) 934 2809 please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of EFTA00827411 JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved Stanley, NM Ph: (505) 934 2809 please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved Stanley, NM Ph: (505)JAM Stanley, NM Ph: (505) 934 2809 EFTA00827412 Stanley, NM Ph: (505) 934 2809 Stanley, NM Ph: (505) 934 2809 EFTA00827413
ℹ️ Document Details
SHA-256
9e535117e087ec5b8544b6444ca355b21deca32cf47ab3f863ea9da4dc82dc78
Bates Number
EFTA00827410
Dataset
DataSet-9
Type
document
Pages
4

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!