EFTA01979473
EFTA01979474 DataSet-10
EFTA01979477

EFTA01979474.pdf

DataSet-10 3 pages 441 words document
P17 P23 V16 P19 D4
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (441 words)
To: Gary Kemey From: Jeffrey Epstein Sent Sat 11/13/2010 2:39:04 PM Subject: Re: FW: LSJ - Pool and Main Residence ask them to provide contracts for mechanical construction. and administration. On Sat, Nov 13, 2010 at 12:52 PM, Gary Kerney ‹ > wrote: Jeffrey This fee is in line with schematic design per my estimate J reccomend you approve. Gary From: Warwick Wicksman [mallto Sent: Fri 11/12/2010 6:32 PM To: Gary Kemey Cc: Tom Sze; Doug Schoenle; Zattia Mitchell; Rich Kahn; Darren Indyke (AOL) Subject: RE: LS3 - Pool and Main Residence Hi Gary, Attached is our proposal for the pool area and main residence. This is to develop the current scheme, for just this area, to a Schematic Design level. Once that is done, assuming there are no major changes, we will provide a separate proposal to prepare construction documents and engineering as necessary. This will simply the CD phase, and simply the work of any required consultants. I am working on proposals for conceptual design services the Spa and Guest Cottage, and will send them on Monday. Thanks, Warwick Warwick Wicksman, AIA Prin i I Gensler 2500 Broadway Suite 300 Santa Monica, California 90404 USA EFTA_R1_00467097 EFTA01979474 From: Gary Kerney [mailto Sent: Wednesday, November 10, 2010 3:33 AM To: Warwick Wicksman Subject: Fwd: LSJ FYI F 1 let's get the doe's going, include the spa Sent from my iPhone Begin forwarded message: From: "Jeevacation" <[email protected]> Date: November 10, • • To: "Gary Kerney" Subject: Re: LSJ Yes fl Sorry for all the typos .Sent from my iPhone On Nov 10, 2010, at 1:07 PM, "Gary Kerney" < wrote: Jeffrey were the 11/3 Fl or F2 schemes close enough to your concept to have Gensler take one of them to the next level and contract? also should they be producing a schematic for the SPA to review From: Warwick Wicksman [mailto Sent: Tue 11/9/2010 7:27 PM To: Gary Kerney; Doug Schoettle Cc: Tom Sze Subject: LSJ Guys, any word from Jeffrey on how he wants to proceed? Warwick Warwick Wicksman, AIA Principal EFTA_R1_00487098 EFTA01979475 Gensler 2500 Broadway Suite 300 Santa Monica, California 90404 USA *********************************************************** The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected] and destroy this communication and all copies thereof, including all attachments. EFTA_R1_00487099 EFTA01979476
ℹ️ Document Details
SHA-256
9f1b83c9f3ce06faf42c9dc20a9d23061083ca871c60492bb0a00c1ebae0b906
Bates Number
EFTA01979474
Dataset
DataSet-10
Document Type
document
Pages
3

Comments 0

Loading comments…
Link copied!