To: 'eevacation maitcom 'eevacation©gmail.com];
Fran: Lvjet
Sent: Thur 12/10/2015 10:53:26 PM
Subject: 6727 Update
Jeffrey,
I will have firm date from Quick Wing tomorrow regarding completion of B727„ Boost Pump control Box, its in
Works as we speak.
Update from Larry Morrison: ref 8727
The ADs and NDT's (Non Destructive Testing) are complete with no issues. The A Check is mostly complete.
They are addressing a fuel leak in the wing at a flap track. Once cured they will put fuel back in the wing for
engine runs and another pressurization check. The pacing item is Peter Swift and the Aux Tank component.
LM
B727
I'm also obtaining Pricing for TCAS 7.1 upgrade for the Boeing 727 at this time, Europe control requires
this as part of CPDLC, by Dec 31st. 2015, its a software update to our TCAS computer. $30k range.
also, we are pricing Heavy C check due for Boeing 727 July 2016 of next year.
GIV
obtaining Pricing for 48 month inspection due for GIV in June of 2016.
we need to space these inspections so you have One aircraft available to use.
could you put these reminder dates in JEE calandar?
GIV due inspection June 1st or earlier. 3 week down time estimate.
B727 Due C check inspection due July 2016 / 4 week down time, estimate.
EFTA_R1_00619810
EFTA02066229
ℹ️ Document Details
SHA-256
9f4916cb2b62bb6eb7b4e5b8085dc9e7882d002760d230d399c49c8591df94bc
Bates Number
EFTA02066229
Dataset
DataSet-10
Type
document
Pages
1
💬 Comments 0