EFTA00828418
EFTA00828419 DataSet-9
EFTA00828421

EFTA00828419.pdf

DataSet-9 2 pages 389 words document
P17 V16 V12 V11 D6
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (389 words)
From: Richard Kahn To: Jeffrey Epstein <[email protected]> Subject: Fwd: Great St James Date: Sat, 30 Apr 2016 15:23:04 +0000 Sent from my iPhone Begin forwarded message: From: Hugo Hodge Date: April 30, 2016 at 10:27:08 AM EDT To: Richard Kahn Subject: Re: Great St James Good morning Mr.Kahn, I have thoroughly reviewed your suggestions for modifications to the bid and given your request great consideration. I honestly believe that the items you requested are important for a successful project. For example, the witnessing of the factory acceptance is not a step I would recommend omitting. With that said, the items you suggested to remove total $23,000. To ensure the integrity of this project I am willing to do the project with the entire scope at the original price less $23,000 for a total of $80,000. If you decline this option and are convinced that these items should be omitted, I am willing to reduce the remaining items by 10% resulting in a cost of $72,000 for the revised scope. I strongly recommend you consider the first option but I am willing to discuss this further with you if necessary. Best Regards, Hugo Hodge Jr On Thu, Apr 28, 2016 at 12:32 PM, Richard Kahn < > wrote: it was a pleasure speaking with you earlier. as discussed the following areas are scopes that will not be needed and my comments: a) conceptual design on cable routes - ok to keep - please revisit pricing b) detailed cable specs and preparation of bid does - ok to keep - please revisit pricing c) detailed switch and meter design and prep of all switches and metering device - ok to keep - please revisit pricing d) review all switch and cable bid submittals and submit to Wapa for approval - ok to keep - please revisit pricing e) witness factory acceptance test - not necessary as all we need isfor you to review testfrom manufacturer and should be included in d) above 0 complete final design to include civil and electrical drawings - ok to keep - please revisit pricing g) witness installation and test electrical devices - not needed h) complete as builts - not needed EFTA00828419 i appreciate your effort in revisiting your pricing and look forward to hearing back from you this afternoon thank you Richard Kahn EFTA00828420
ℹ️ Document Details
SHA-256
9f8ec9ee92e67f5cdcbec3089c5067eaaaba36822e18ea54d10764ab71ed4dad
Bates Number
EFTA00828419
Dataset
DataSet-9
Document Type
document
Pages
2

Comments 0

Loading comments…
Link copied!