EFTA00642736.pdf

DataSet-9 2 pages 390 words document
👁 1 💬 0
📄 Extracted Text (390 words)
From: Richard Kahn To: Jeffrey Epstein <[email protected]> Cc: Ann Rodriquez Subject: Fwd: expense list new boat Date: Sat, 23 May 2015 08:38:38 +0000 Boat is being surveyed Sunday by same individual who did little c. Surveyor asked for batteries to be charged and Carlos said that boat did not gave electrical system. Therefore I have been pushing Carlos to capture all costs if we were to move forward with purchase. Attached lays out Carlos estimates yet does not talk about electrical? Richard Kahn HBRK Associates Inc. 575 Lexington Avenue, 4th Floor New York, NY 10022 Begin forwarded message: From: Carlos Rodriguez Date: May 22, 2015 at 1:22:26 PM EDT To: Ann Rodriquez , Richard Kahn <1 >, Daphne Wallace Subject: expense list new boat Reply-To: Carlos Rodriguez Greetings all Offshore Marine (2)360-400 horse power yanmar diesels with transmissions. Exact model and horse power to be determined when they examin vessel and take measurements. Verbal estimate from Harald at offshore marine, between 40k and 50k per engine and 10k install and gauges. Capt Benji Shwartz This person runs a boat towing business in the usvi and can arrange for new vessel pick up from Virgin Gorda. His rate is 275$ an hour that does not include customs fees. I estimate a full 8 to 10 hour day for this depending on ocean conditions. Between 2,200$ and 2,750$. Virgin Gorda Yacht Harbor The storage bill in the yard is the sellers responsibility, the travel lift charge to launch the boat is the buyers. This comes to 456.00$ dollars (38 feet at 12$ a foot) Other expenses EFTA00642736 Garmin GPS 721 similar to Nannas is $998.00 Standard horizon VHF radio GX1300 is 125.00$ Boat registration 150.00$ Life Jackets (30) at 11.00$ a piece.is 330.00$ Fire extinguishers -At LSJ Flashlight/ Flares/Misc safety equipment, 300.00$ Haulover Marine We might incur in storage fees and maybe crane fees, since they are right next to offshore and they might need them for putting engines inside the vessel. Also some machine shop work might be needed when connecting motors to shafts and props. Im sure there will be other expenses related to this project I will do my best to try to forsee them and let you know. There might be a BVI government charge for exiting the territory I will try to find out. Thankyou Carlos EFTA00642737
ℹ️ Document Details
SHA-256
9fc6fcc213f407988d058498c32a2efd40c0e244134dbf5951b46779d58ac854
Bates Number
EFTA00642736
Dataset
DataSet-9
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!