From: Kyle reavis
To: J <[email protected]>
Cc: Richard a,
, LSJ Michael Glidden
Subject: Re: Cabana 3 and 4 Plumbing Issue
Date: Wed, 19 Dec 2018 18:25:14 +0000
Update;
Cabana 3 - tiles have been removed, the plumber is cutting the line now and will finish the plumbing in the
morning, then tile will be put back (2 1/2 tiles). Grouted and sealed, then completed.
Cabana 4 - wall has been opened up, the area we need to have Jon split has been identified and will be split in the
morning. The wall will be patched back and painted tomorrow. Cabana 4 will be done.
Pops Garden - All tiles installed, grouted tomorrow.
Heli Pad- All tiles removed, installation tomorrow, grout Friday.
Kyle
On Wed, Dec 19, 2018 at 1:43 PM J <[email protected]> wrote:
little i can say
On Wed, Dec 19, 2018 at 11:43 AM Kyle reavis < > wrote:
Good Morning,
The plumbing for the showers in cabana 3 and 4 were run incorrectly by JPKs plumber Brian. He tied in
both the hand held shower head and the main shower head into one line instead of two. This means that
when you turn on the handle (there are 2) that water comes out of both shower heads. The only way to fix
cabana 3 is to remove tiles and split the line the correct way. In cabana 4 they can access the pipes from the
backside of the shower wall leaving the tiles in tack. They are going to start the split in 4 first today. I am
going to check now to see if we have enough tile to do cabana 3. The plumbing in 1 and 2 were tested today
also and have no issues, these two were plumbed by JPKs plumber Jon. We will have Jon do the fix in 3 and
4. Until they open the wall I cannot give an end date on this work. I suggest no payments made to JPK until
the work is completed, I know that Jay had paid Brian for all of this work as completed. Jay will be notified
by email of these issues immediately.
Very Respectfully,
Kyle Reavis
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
EFTA01011131
WE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA01011132
ℹ️ Document Details
SHA-256
a0cfe0098ecdb4cdc7e2a106471e78d2e41b0842c419c425591e13389b0da4bb
Bates Number
EFTA01011131
Dataset
DataSet-9
Type
document
Pages
2
💬 Comments 0