EFTA01037616
EFTA01037618 DataSet-9
EFTA01037619

EFTA01037618.pdf

DataSet-9 1 page 269 words document
P23 V16 P17 V11 V12
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (269 words)
From: Richard Kahn To: "Jeffrey E." <[email protected]> Subject: Fwd: Pool Cabana Flag Pole Erection Date: Thu, 07 Jun 2018 19:08:47 +0000 Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 Begin forwarded message: From: michael glidden Subject: Pool Cabana Flag Pole Erection Date: June 7, 2018 at 3:05:27 PM EDT To: Richard Kahn < Cc: Good day. A plan has been created for the pool flag pole as follows. The area immediately to the east of the pool pump room building will be brought up in elevation to match the roof elevation of the pump room. Also the area between the pump room and the retaining wall surrounding the pool cabana will be filled in to match the same elevation. Jules has been asked to do the work and has said he can complete what needs to be done by Wednesday/Thursday next week. Jules said that he has enough stone ready on GSJ now. He also said that whatever dirt he will need is available on LSJ. The reason for the increase in elevation of the described area is to allow for a larger foot print of level ground to get the crane as close as is needed to be able to both pickup and then swing and set the pole. All added dirt/stone work will be temporary and can be returned to prior condition but that would not happen before Mr Epstien's visit on Sunday, the 17th. If anyone has any issues please let me know. Otherwise, Boscoe has been scheduled to start running stone from GSJ to LJS tomorrow. Thanks, MG. EFTA01037618
ℹ️ Document Details
SHA-256
a12ddba772a8bede1f2f309f3c1a3fade79f0924b376af5767ed0bc60133b9d8
Bates Number
EFTA01037618
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!