Begin forwarded message:
From: michael glidden
Subject: Pool Cabana Flag Pole Erection
Date: June 7, 2018 at 3:05:27 PM EDT
To: Richard Kahn <
Cc:
Good day.
A plan has been created for the pool flag pole as follows.
The area immediately to the east of the pool pump room building will be brought up in elevation to match the
roof elevation of the pump room. Also the area between the pump room and the retaining wall surrounding the
pool cabana will be filled in to match the same elevation. Jules has been asked to do the work and has said he
can complete what needs to be done by Wednesday/Thursday next week.
Jules said that he has enough stone ready on GSJ now. He also said that whatever dirt he will need is available
on LSJ.
The reason for the increase in elevation of the described area is to allow for a larger foot print of level ground
to get the crane as close as is needed to be able to both pickup and then swing and set the pole.
All added dirt/stone work will be temporary and can be returned to prior condition but that would not happen
before Mr Epstien's visit on Sunday, the 17th.
If anyone has any issues please let me know.
Otherwise, Boscoe has been scheduled to start running stone from GSJ to LJS tomorrow.
Thanks,
MG.
EFTA01037618
ℹ️ Document Details
SHA-256
a12ddba772a8bede1f2f309f3c1a3fade79f0924b376af5767ed0bc60133b9d8
Bates Number
EFTA01037618
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0