To: Brice Gordon
From: Jeffrey Epstein
Sent Sat 5/18/2009 3:05:58 PM
Subject Re: FW: Mechanical & Engineering Plan.
i would like to know,when i will receive my genslre very rought draft of budget and timetable.. ,
why when in my nov notes. it says we agreed to rid of scott graft that this has not happened.. I
would like to see photos of the gravel that we are making and the hydroseeding please.. thanks
as always
On Sat, May 16, 2009 at 4:52 AM, Brice Gordon wrote:
To: JEE
Attached is a basic plan for the build out of the existing Mechanical and
Engineering. Some of these ideas have been suggested separately, but this
plan ties everything together, for a total overview.
I. Fit out New Mechanical Building with the following:
2 x generators & switch gear, fire suppression equipment
2 x Fuel Tanks
1 x new RO system, poly tanks below for water storage
TI & Data/fiber Distribution Room.
2. Replace existing Metal Structure at engineering with a larger enclosed
shelter to accommodate the servicing of heavy machinery, basic
refurbishment of existing tool storage areas.
3. Lay a concrete pad and retaining wall between Mechanical and Engineering
buildings for fuel truck storage and oil containment. This would satisfy
DPNR requirements for such storage.
4. Erect a new enclosed Metal structure to house 3 ax 40' containers for
hurricane storage, landscape material and a parking area for atv's,
polaris's etc. This location would be above flood Plain.
5. Terrace area as you suggest, below proposed Hell Pad parking area and
metal structure below
Should we proceed with estimating expenditure for each phase of this plan?
For your consideration.
EFTA_R1_00203123
EFTA01827822
Regards Brice
End of Forwarded Message
EFTA_R1_00203124
EFTA01827823
ℹ️ Document Details
SHA-256
a149e1cda1cf51d0c6db1fc0af9da7b1a18e7c0f5a59157c60e438013041b8e1
Bates Number
EFTA01827822
Dataset
DataSet-10
Document Type
document
Pages
2
Comments 0