EFTA02596006.pdf
👁 1
💬 0
📄 Extracted Text (169 words)
From: Jermaine Ruan
Sent: Wednesday, November 22, 2017 2:29 PM
To: Rodriquez Ann; E. jeffrey; Kahn Richard; Wallace Daphne
Subject: Vehicle repairs schedule
Attachments: imagel.PNG; Untitled attachment 00798.txt; image5JPG; image2.PNG; image3.PNG;
image4.PNG; Untitled attachment 00801.txt
Good Day Boss
LSJ suburban went in first the week before the first hurricane. It lost 3 g=ass panels on the driver side, due to hurricane
Irma. Those panels were ord=red and repairs set to begin immediately but then the second hurricane. Mar=a hit. Mr
VanHolten is replacing those panels at his cost. They recently arrived on island and repairs are forward as planned. The
car is scheduled to=be released Wednesday next week. Then the Denali is going in for repairs to=the driver side bumper
and a polish. The black F250 will follow for repairs=of a scratch on the passenger side tail. Larry's Suburban will be the
final=vehicle on the schedule for repairs for dents, broken rack and to be painte= and polished. Attached are pictures of
L51 Suburban after the hurricanes.=
EFTA_R1_01780845
EFTA02596006
ℹ️ Document Details
SHA-256
a3dbb7a018511bc49798fea7a251b815708806e3a205fb72ded3df486c939f6e
Bates Number
EFTA02596006
Dataset
DataSet-11
Type
document
Pages
1
💬 Comments 0