To: [email protected][[email protected]];
jeevacationCcDgmail.com 'eevacation mail.com
Cc:
From:
Sent: Wed 3/14/2012 10:24:55 PM
Subject: update GIl / B727
Jeffrey,
still working GIl, installing flight controls tonight and tomorrow, need full day Friday to get ops checks completed,
does not look good for Saturday either, in my opinion.
from Gulfstream:
Larry
We still have a lot of work ahead of us,
1. Rudder still needs to be installed, Waiting on parts ( hardware)
2. Elevators need to be installed
3. Flaps need to be rigged and then installed. We have some fasteners that
needs to be installed prior to hanging the flaps. Parts are on order
4. All flight controls need to be functional checked after installation
5. Engine runs and over speed functional checks
Sean,.
Boeing 727:
I fueled the Aux tanks in the Boeing today to confirm their operation for north Atlantic crossing, just to triple
check the system. The system worked on flight to palm Beach, The fwd AUX tank transfer valve did not open.
we are trouble shooting at this time. will update you later tonight. unbelievable! I am glad I check this operation
at this time,.as precautionary measure. could be simple valve change,.
thx
Larry
EFTA_R1_00513981
EFTA02012138
ℹ️ Document Details
SHA-256
a4700ca8b58a9a9ac4433dab1b871905c95b6b983bb2071c92e5ffe5e2f03f77
Bates Number
EFTA02012138
Dataset
DataSet-10
Type
document
Pages
1
💬 Comments 0