EFTA01833723
EFTA01833724 DataSet-10
EFTA01833726

EFTA01833724.pdf

DataSet-10 2 pages 262 words document
P19 V16 P20 D3 P17
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (262 words)
To: ff in' i n m ' Cc: From: Gary Kemey Sent: Tue 2/1/2011 9:04:24 PM Subject: Fwd: DPNR FYI Sent from my iPhone Begin forwarded message: From: "paul" <=a> Date: February I, 2011 10:55:08 AM AST To: "Gary Kerney" <1. > Subject: RE: DPNR Gary: I spoke directly today with Joe Blyden (plan examiner) - he did not want to be pinned down with a date for approving the project — but said to me to give it a "couple of weeks" — I will go in to see him later this week to push it down the tracks — Paul Paul Ferreras Paul Ferreras, PE Structural Engineer 9-1 Estate Bellevue PO Box 600,22 St. Thomas, USVI ooSot From: Gary Kerney [mailto Sent: 2011-02-01 10:29 To: paul Subject: RE: DPNR Paul Any update? Thanks Gary EFTA_R1_00212241 EFTA01833724 From: paul [mailto Sent: Mon 1/31/2011 10:00 AM To: Gary Kerney Subject: DPNR Gary: I called over to DPNR — Joe Blyden (our examiner) Is currently out of the office until later I will call back and track him down — Paul Paul Ferreras Paul Ferreras, PE Structural Engineer 9.1 Estate Bellevue PO Box 600122 St. Thomas, USVI oo8ot Information from ESET Smart Security, version of virus signature database 5834 (20110131) The message was checked by ESET Smart Security. http://www.eset.com Information from ESET Smart Security, version of virus signature database 5837 (20110201) The message was checked by ESET Smart Security. http://www.cset.com Information from ESET Smart Security, version of virus signature database 5837 (20110201) The message was checked by ESET Smart Security. http://www.cset.com EFTA_R1_00212242 EFTA01833725
ℹ️ Document Details
SHA-256
a473921801c7fa12444f46093cfceecb709967d1926d488effaefb727d56c59f
Bates Number
EFTA01833724
Dataset
DataSet-10
Document Type
document
Pages
2

Comments 0

Loading comments…
Link copied!