EFTA01125170
EFTA01125173 DataSet-9
EFTA01125174

EFTA01125173.pdf

DataSet-9 1 page 393 words document
P17 V16 P23 P20 P19
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (393 words)
Brennan Bros. Co., Inc. Plumbing and Heating Contractors BRIAN FREER JOHN K. BRENNAN TERENCE P. BRENNAN NYC Office: President Vice President Vice Presideal 3150 ALBANY CRESCENT - BRONX, NY 10463 LICENSED PLUMBER LICENSED PLUMBER NYC #1545 NYC #1540 Telephone Westchester K761 Westchester ORM Fax December 29, 2012 Mr. Richard J. Bamett Property Manager for 9 East 71" St. New York, NY 10021 Re: 9 East 71" Street-Domestic Water Heater Replacement BBCI Plumbing Proposal #12-9345 Mr. Barnett: We herewith submit our proposal to perform work in our line at the above referenced job location according to the site visit and as outlined below: Mechanical Equipment Room- Remove and Replace Domestic Water Heater • To shut down, isolate and drain the existing A.O. Smith DVE-250-45 electric water heater. • To remove the metal jacket on the heater and cut the storage tank in pieces so it can be removed from the site. • To extend the existing concrete pad approximately 18" to accommodate the new (2) heater configuration. • To famish and install (2) A.O. Smith DVE-120-24 water heaters rated at 208V, 3 Phase and 24kw each. • To furnish and install A.O. Smith Dun-Power manifold kit to connect the two heaters in parallel. • To famish and install the necessary 1 '4", 1 1/4" and %" copper type "L" tubing with wrought copper fittings, valves and adapters necessary for the installation. • To test the new piping for leaks and proper operation. • To insulate the new piping with I" thick fiberglass insulation. All work is to be performed in a neat and workmanlike manner for the sum of...S32,450.00 Notes & Exclusions: I. All work is to be performed on regular time, no overtime. 2. A deposit of $20,000.00 is required to order the heaters which are a custom non-returnable items. 3. Lead time on the heaters is 2 weeks from the factory in Seattle. 4. Price does not include any electrical work, control wiring, painting, painting of piping, video inspection, slab scan, beam cuts, welding, engineered drawings, cutting, patching, chopping, digging/trenching/bedding/backfilling/saw cutting/concrete work, painting, sprinkler work, HVAC, CADD as-built drawings, seismic hangers, fire stopping, heat tracing, leak detectors, toilet accessories, access doors, responsibility for existing plumbing systems, temporary toilets, lead abatement or asbestos abatement related work. Sincerely, Brennan Bros. Co., Inc. John K. Brennan, VP "We are proud of our connections. "t EFTA01125173
ℹ️ Document Details
SHA-256
a4b982ef64f61b747f2c65e7f6cbfd0410c17bf194162eca7353eece848371bd
Bates Number
EFTA01125173
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!