From:
Sent: Saturday, August 8, 2015 1:18 PM
To: NYC - Jeffrey Epstein
Cc: NYC - Richard Kahn; Allenby, Leighton
Subject: Paving project additional approval needed
Better Roads was never provided the plans submitted by woods/engineer Missing on bid:
32 Swales $42,486
3" crusher run base/1360 tons with trucking $90,712.
Asphalt was $512,500
New Total $645,698
Time line addition
5 additional days for swales
12/15 days for crusher run
Both swales/crusher 17/20 days on top of original timeline
If swales are put in after crusher run snd asphalt add $250 per swale x 32 ==$8,000.
Also LSJ staff has to put in silt fencing as per plan and permit
I received the correct plans with all this additional information a few days=ago. Better Roads said they were not given
this info by woods. Woods did no= return Our call.
I strongly suggest doing these roads correctly. We will have a lot of washou=, undermining and cracking pavement if we
do not do the swales in the crush=r run.
How do you want to proceed
Call me if you need more clarification
Leighton Allenby
Director of Properties
<?xml version=.0" encoding=TF-8"b
<!DOCTYPE plist PUBLIC "-//Apple//DTD PLIST 1.0//EN" "http://www.apple.com/DTDs/PropertyList-1.0.dtd">
<plist version=.0">
<dict>
<key>conversation-idgkey>
<integer>107942</integer>
<key>date-last-viewed</key>
<integer>0</integer>
<key>date-received</key>
<integer>1439039886</integer>
<key>flags</key>
<integer>8590195717</integer>
EFTA_R1_01617110
EFTA02493749
<key>gmail-label-ids</key>
<array>
<integer>6</integer>
<integer>2</integer>
</array>
<key>remote-id</key>
<string>532924</string>
</dict>
</plist>
2
EFTA_R1_01617111
EFTA02493750
ℹ️ Document Details
SHA-256
a4d13b324302350ca621d941cae92cccc53e930d40ef1a17e187350b747280ca
Bates Number
EFTA02493749
Dataset
DataSet-11
Document Type
document
Pages
2
Comments 0