1 . I have the first draft of the trust legislation, its rough but i am confident you will get the product on time. .
its over 200 pages .
I am willing to jump through the new dpnr hoops i( below ) in order not to create waves. I will be patient
and spend the thousands of dollars needed for unncessary surveys to point out where the garbage is. , to define
the dimensions of the location of 20 palm trees. which i myself showed the inspector , but it seems without a
measuring tape. . and apply for a variance so that i may hang an american flag at 80 feet vs 45. ( the rules
state only 15 feet on top of a two story structure„ so they interpret 45 feet allowed.? ) they also wanted me
to detail the machinery that will be used to pull the mulcher. ? I am around for coffee this week or as usual
you are always welcome to come for a meal.
Forwarded messa e
From: Erika Kellerhals
Date: Fri, Sep 9, 2016 at 5:09 PM
Subject: Re:
To: "jeffrey E." <[email protected]>, "Jean-Pierre L. Oriol'l
Cc: Cecile de Jongh
Jeffrey,
JP, Commissioner Henry, Cecile, Amy and I had a productive meeting this afternoon. The following deliverables are
required with respect to the clean up permit:
1. Revised map showing location of garden with dimensions included on map, so that DPNR can calculate approximate
square footage of area to be planted. It is understood that the permit will likely include a special condition that a berm be
biu
2. GPS mapping (which will be completed on Monday and Tuesday) with description of extent of clearing on roadside
(e.g. roadside will be cleared 3' on either side with notations as to which trees may be removed as part of the clearing and
which trees will be kept with descriptions thereof). GPS mapping will include the identification of locations where large
trash and debris piles, which include boat parts, refrigerators, etc will require the use of heavy equipment for removal.
JP: it appears that Mr. Epstein will undertake combination of burying and mulching — particularly since we explained the
benefit of mulching with respect to erosion control, etc. We will provide specs on mulching equipment that can be towed
behind the excavator. We will also provide a notation of the area where dried brush would be buried.
Commissioner Henry indicated that she would expedite the permit approval. I know you are travelling next week so
please advise to whom we should submit this additional documentation.
EFTA00819050
Also, we are confirming our discussion, that DPNR may approve the 45 foot flagpole and that any request for a variance
must be made directly to the Board of Land Use Appeals.
The helipad will be submitted as a separate permit application, the survey to be included will be completed next week
and forwarded.
JP: Please confirm that my understanding of deliverables is correct.
From: "jeffrey E." <[email protected]>
Date: Friday, September 9, 2016 at 4:44 PM
To: Erika Kellerhals >, "Jean-Pierre L. Oriol"
erika , jp.
can you please send me an email as to exactly what it is that we still need to deliver. and the timing for
approvals. I understand that we must ask for a variance for the 80 foot flagpole. ? should i assume that once
we submit the heli copter drawing , which is simply a 80 foot cirlcle that we have laid out on the map.
permsiions will be given ? i understand that we need exact dimenstions of the place for 20 palm trees. . and a
survery of where i have lots of debris? to avoid any further misunderstanding i would like an agreed email .
thanks.
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
please note
EFTA00819051
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA00819052
ℹ️ Document Details
SHA-256
a532721517d5786fab36d1ef723d31c87dcec6cae8278e1cb2403b9823faacdb
Bates Number
EFTA00819050
Dataset
DataSet-9
Document Type
document
Pages
3
Comments 0