EFTA01988370.pdf

DataSet-10 1 page 174 words document
P23
👁 1 💬 0
📄 Extracted Text (174 words)
To: jeeyacationagmail.com[jeeyacation@gmaitcom]; Jeffrey Epstein[eeyacation@gmaiLcom] From: Gary Kerney Sent: Tue 7/5/2011 7:34:19 PM Subject: FW: change orders LSJ Change Order #5.doc LSJ Change Order #6.doc LSJ Change Order #7.doc LSJ Change Order #8.doc LSJ Change Order #9.doc LSJ Change Order #10.doc Jeffrey Attached are the proposed change orders from pool contractor Summery Main pool # 6 chip plaster $15,550 # 7 blue plaster material and shipping 10,471.25 apply plaster 18,899.75 0 9 add 7 LED lites(only if we replaster) 12,145 Flagpole pool # 5 blue plaster material and shipping $10,471.25 #10 add 7 new LED lites 12,145 NOTE: Bart says we can change existing to500 watt wide anole LED ittes Blue on the main pool and white on the blue plastered flagpool The blue plaster is on hold pending the decision whether to do one or both pools.we can get it from fla. in a week From: Wendy Lockman [mailtol Sent: Tue 7/5/2011 2:58 PM To: Bart Wolterman; Gary Kemey Subject: change orders Please let me know if you have any further questions. EFTA_R1_00480192 EFTA01988370
ℹ️ Document Details
SHA-256
a545a162021990e5e8e1f8f4c2df0533e867825d2c70a5b346ebc7d1e49397d9
Bates Number
EFTA01988370
Dataset
DataSet-10
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!