ESTATE PROGRESS REPORT — November 28, 2003
7151 STREET
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
Schedule Changes to Pinto's schedule: Mirrors are expected early Jan, not
early Dec.
51h Floor 1. Front Room Pinto - Jean
a. Front room to remain GM's office.
b. Metal table style & 2 arm chairs for GM office.
c. Carpets to be changed. Pinto
d. Current furniture to remain.
e. Pinto to specify paint color for trim & interior wall finish. Pinto
2. Back Room
a. Back room to eventually become children / nanny room. Pinto
has been informed.
b. Lynn & Jojo are to move into the basement as soon as
construction is complete.
c. Bathroom to stay as is for the time being.
Fax sent to Pinto Nov 24 inquiring when the MBR is to be installed Pinto
— no response yet.
6'h Floor Round table: is in the process of being restored. Expected J Burdine 11/28
completion by Nov 28 — delay due to miscalculation of time frame.
Ceiling Speakers No speaker in MBR. Speaker wire in cornices.
Dining Room 1. Table-top: Brian Kelly is storing new rectangular table-top in
his shop until after construction phase.
2. Lighting: JE approved three chandeliers instead of spotlights.
3. Carpet: JE approved green-striped carpet. Pinto - Jean
EFTA00577479
ESTATE PROGRESS REPORT — November 28, 2003
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
4. Speakers: on dining room ceiling.
Entry Hall 1. Entry hall door: not to be moved.
2. Entry hall marble floor: to remain.
3. Original chandelier to remain but be painted white.
4. JE wants silk banners to hang in front entry hall in front of Pinto
Japanese paintings. Pinto to source.
5. JE has samples to select exact shade of pink for the entry hall JE
walls.
Main Stair 1. To be re-carpeted — JE saw sample in Paris & did not approve. JE
JE to advise if he liked new sample sent by Jean to 7151 St.
2. Sconces to ship from Paris week of Nov 10 — delayed to Dec 8.
3. JE agreed to spotlights for tapestry.
4. Alberto to make shelves to place sculptures or china pot on by
tapestry.
Kitchen Service Kitchen & corridor painted white. Clark to provide prices on Clark / Doug
Corridor limestone floor. Doug has samples for JE to choose from. Pinto to / Pinto
send more samples.
Speakers Speakers from Zorro mended & are in basement of 71i1.
Gym 1. To be painted by painters that are at 7P1 St now not French Pinto
painters. Pinto to advise paint scheme.
2. Sample carpet expected by Nov 26.
3. Yoga Room is to remain the same.
4. Gym Bath is to remain the same.
2
EFTA00577480
ESTATE PROGRESS REPORT — November 28, 2003
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
MBath 1. MBath carpet: border of original carpet to be left & Jean to Pinto — Jean
provide new insert. JE chose blue & white carpet. Pinto has
selected carpet & is due to arrive in Feb 2004.
2. Ceiling: complete; scaffold to be removed week of Dec 1.
3. Bed & little table: Pinto to purchase. Pinto has been informed Pinto
to ensure that the bed is delivered prior to completion of the MBR
walls so as to make sure the bed fits.
4. Skylight bars - JE advised to dispose of bars. Skylight is being
mended.
MBR 1. Windows: approved to be further sound-proofed. Installation to Doug
begin after painting & hoisting of scaffold & carpet through
windows.
2. Plaster sconces are at 71s' Street.
3. Wall paper is due end of Feb. Pinto
4. Painting & passageway to be painted to match Bedroom. Pinto Pinto - Jean
to confirm paint color.
5. Decorative painting in progress — completion in Dec.
Mirrors Second floor landing: Mirrors to be delivered to house Dec 8 — Pinto
delayed to Jan 8. Awaiting response from Pinto re installation.
Oriental Rug Expected completion by Dec. Costikyan
Technology 1. Security: Surveillance Cameras (3rd Floor): wiring complete.
Cameras to be installed once construction near completion. PTV
camera outside building installed. Night vision camera installed &
tested. Installation is in progress.
3
EFTA00577481
ESTATE PROGRESS REPORT — November 28, 2003
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
2. Computer: Upgrade for Landis BMS — complete. Software has Complete
been loaded on new computer, new graphics installed & complete.
Static IP address for offsite connection installed.
3. Computer Networking — WIFI entire house. Complete except
in areas under construction.
4. MBR A/C Upgrade: JE approved MBR fan & cooling tower
upgrade - revised total of $87,022.66 includes electrical, ABB
Drive, & engineering fees (with design plans for chiller). Awaiting
cost for adding a separate control panel for Landis to hook system
up to BMS — proposal expected by Nov 18 — delayed.
Terrace Jean to come up with new suggestion. Pinto - Jean
Bio Gear 2 medium, 1 large biosuits ordered. 1L at 65th St, to be sent to 71st Dupont delay
St. The 2M are backordered until Jan 21. Steve Joslin, who
ordered the suits, not able as of Nov 21 to source other suppliers
for earlier delivery.
Blackout Update Since the Black Out the following Emergency Systems have been
checked or tested to assure proper operation in the event of a power
failure. The following list contains the results of these tests.
1. Emergency Generator: cooling radiator to be cleaned & flushed. Cummings 11/7
To be done on next maintenance check — not urgent. Metro Power
2. Battery Lighting Inverter - battery racks & all 48 batteries are
still on order.
4
EFTA00577482
ESTATE PROGRESS REPORT — November 28, 2003
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
3. Otis: Inspection of the elevator is complete. FYI: In an
emergency / electrical problem, the lift automatically goes to the
ground floor & the doors stay open.
A regular phone line needs to be installed in the lift — Rich to Rich
organize.
Massage Room Ceiling to be painted with clouds by the same painters being used
Ceiling for the MBR woodwork. To be scheduled with painters when Jean
on site Dec 5.
Living Room Fire Screen: Jean was told to order one. Pinto - Jean
Nextel phones The problem when JE was trying to ring was that had JE
forgotten her phone in the bathroom. JE to advise if any further
problems with this system exist.
5
EFTA00577483
ESTATE PROGRESS REPORT — November 28, 2003
457 MADISON
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
Office Dividers Estimate & floor plan without new desks is in. Estimate & plan with H Miller / JE
new desks expected by Nov 12 — delayed due to H Miller
accommodating changes & awaiting window tint selection. JE to
advise on window samples which were taken to LSJ on last trip.
Office Computers 1. Upgrade / change computers, new programs.
Approved: 20 computers to be re-vamped.
a. LSJ & Z computers ordered & expected by Nov 21 — not arrived
yet.
b. Other new computers: 6 to be ordered.
c. 10 computers remaining to be upgraded as needed.
JE to advise fate of replaced computers: Should they go into 301? JE
2. Approved Microsoft Project & hardware upgrades. Solomon Marc / Eric
accounting system was rejected. Marc is assembling an on-line
training package to familiarize project managers with the new
system. New servers are being installed on Dec 1.
Conference Room Jeff Schantz's room to be turned into a conference room. 12/12
I. 8 Lucite chairs have been ordered week — expected by Dec 12. Kartcll
2. Rich to order collapsible table. Rich
3. Cabinets to be removed from room by Dec 12.
Blackberry's All key personnel, Larry V, Larry M, Dave Rodgers should
have Blackberry's.
6
EFTA00577484
ESTATE PROGRESS REPORT — November 28, 2003
PALM BEACH
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
Renovations 1. Doug, Pascal, & Marsh met in PB. Doug to interview 4 Doug
construction company candidates on Dec 1 in PB.
Construction to commence in Feb 2004 as planned.
2. Doug has received the plans for enlarging the breakfast room
from Pascal.
3. JE is considering putting up wooden shutters with in the house.
4. JE to advise if a house is to be rented. JE
5. No work has been done on the Cabana. According to Pascal, he JE
was not aware that any work was requested to be done on it. JE to
advise next action.
Air Conditioning Approved - Cassidy proposal to remove pink room from main Cassidy
house unit & put on a separate unit so that each guest room has
their own unit. To be done during construction phase.
Cassidy has replaced the air ventilator grills in MBR to reduce Complete
excess noise.
Painting Approved - Dock has been sanded & varnished on Nov 21, dry by Complete
Dock Nov 23. JE to view
1999 Merc 5600 5600 mechanical work is complete. Currently being worked on 11/24 11/26
cosmetically (dent removal & repainting) - expected completion by
Nov 24 — delayed to Nov 26.
7
EFTA00577485
ESTATE PROGRESS REPORT — November 28, 2003
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
1997 Merc Stereo is malfunctioning & is being replaced Nov 25. C.D. unit is
being replaced as well since this unit is not compatible with the
new stereo.
Red Jeep Jeep is in shop for repairs — expected completion by Dec 5. 12/5
Landscaping Approved - Stopek has planted aromatic flowers (hedychium) by Complete
the pink gate. JE to view
Outside Table Section of frosted table top is eroded — replacement panel has been 12/12
ordered from Italy & is due in PB by Dec 12.
a
EFTA00577486
ESTATE PROGRESS REPORT — November 28, 2003
PARIS
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
JE office Horseshoe table /Ash tray is still expected in December. Pinto - Jean
Kitchen A/C to be fixed in conjunction with construction. Work to begin Pinto 12/16
Nov 25 & will take approx 3 weeks.
Living Room Separation to be added to round end of living room & new section Pinto — Jean
to be converted into MBR sitting room. Jean met with cabinet
maker & decided on custom made light Italian metal covered in
fabric. FYI: it will take 6 months to make.
Shower Pump 3 valves & 3 shower heads have been installed & according to Complete
Pressure Valsdon, there is a "positive improvement."
Bath JE agreed to new plan for Bath: more cabinets & drawers & a
decorative paint scheme on screen.
9
EFTA00577487
ESTATE PROGRESS REPORT — November 28, 2003
PARIS - NEW APARTMENT
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
Construction Demolition has commenced. Expected completion in April 2004. Pinto - Jean
Original plumber retained. Updated schedule expected by Dec 5 —
Serge said there will be delay in construction due to JE's
adjustments for the bathroom.
Gym Room JE discussed with Pinto on site & decided on wall sconces & Pinto - Jean
double doors.
10
EFTA00577488
ESTATE PROGRESS REPORT — November 28, 2003
PLANES
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
727 Boeing 1. Larry M awaiting fabric selection for office chair. JE to advise. JE
2. Shower water heater & control has removed & is being repaired
To be reinstalled while stripe change is being made.
3. JE requested painted stripe on the exterior to be modified — to
be done (except for full length stripe) week of Dec 1 in PB in
conjunction with shower reassembly & other minor maintenance
tasks — approx 3 day down.
a. The top 1/4" beige to become a 1/2" red touching the top
blue stripe full length.
b. The blue stripes to be lengthened at the leading edge by 1/2".
c. The white stripes to become red.
d. Changes to fuselage stripe will be duplicated on the tail.
Bell 1. Larry V is confirmed for Bell maintenance course Dec 1-12.
Helicopter
2. Larry V needs Pilot training for helicopter no later than end of Larry
Jan. Larry to advise re: dates during his maint course training.
3. Recurrent training: Gary & Maria have completed course.
Nicholas is scheduled for Dec 8-9.
4. a. Nicholas will be off island Dec 5-9 & Dec 26 — Jan 3.
b. Maria will be available Dec 1 — 26.
EFTA00577489
ESTATE PROGRESS REPORT — November 28, 2003
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
c. Gary will be available Dec 1— 30.
Gulfstreatn No. 2 GEE engine has been installed. JE advised for Gulfstream
to be picked up after Thanksgiving
12
EFTA00577490
ESTATE PROGRESS REPORT — November 28, 2003
STAFF
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
Rick Harrington JE to advise if there is any further action to be taken? JE
Personal Nicholas would like to use the Dive Boat that is for sale from
Requests Dec 26 — Jan 3 to take his family to Anagada for New Year's. GM
recommends no.
13
EFTA00577491
ESTATE PROGRESS REPORT — November 28, 2003
MISCELLANEOUS
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
Directories Personalized directories for the houses have been completed. JE
JE has revised sample metal binder. JE to confirm approval.
4 weeks to completion.
NetJets / Flight As of Nov 24, Kocher & other parties are still working on this Kocher
Options matter.
Suburban 2004 Suburban for NY has been ordered. Expected by Dec 1. 12/1
14
EFTA00577492
ℹ️ Document Details
SHA-256
a91e836a97df039e7e52b261a83c6149d34a8ecc8a2792fd03574e0cb9354b64
Bates Number
EFTA00577479
Dataset
DataSet-9
Document Type
document
Pages
14
Comments 0