📄 Extracted Text (836 words)
From: Lvjet
To: [email protected]
Cc:
Subject: Fwd: JEGE 9081E wire for Maintenance
Date: Wed, 05 Mar 2014 16:23:42 -4)000
Attachments: SA2158-N908JE-C Check Induction Invoice.xlsx;
JEGE Statement of Account 2014.xlsx
Jeffrey,
attached is work scope for Boeing Mx visit.
may I have your approval for Rich to Wire 50% payment induction payment?
amount $207,296.00 (this includes the $30,000 labor to remove and replace #1 and #3 engines)
quick break down:
$98,000 C check
$98,000 for squawks found
$30,000 remove and replace Pod engines
AD/SB due $56,755.00
Parts $56,784.00
is this approved?
thank you,
Larry
Original Message
From: JR Stambaugh <
To: Scott Stambau ; jetcare
Cc: 'Lvjet'
Sent: Wed, Feb 26, 2014 12:11 pm
Subject: Re: JEGE 908JE
Larry,
Here is the revised Induction Invoice and updated SOA.
JR Stambaugh
Accountable Manager
Stambau h Aviation
From: Scott Stambaugh
Sent: Wednesda February 26, 2014 11:35 AM
To:
Cc: 13R Stambaugh' ; 'Lvjet'
Subject: RE: JEGE 9081E
The engine changes are part of the quote, they are listed under the additional fixed costs for the 1 and 3 engines, the R
and R, rigging, test runs, as well as all preparation and handling for shipping.
I can remove the battery overhauls, we typically utilize a shop battery here to operate the aircraft (eliminate battery
deterioration if a switch is left on etc... during maintenance) and then we inspect and deep cycle the ships battery so you
go out with a fresh battery.
Scott Stambaugh
EFTA01189580
912-399-0030
From: [mailto:
Sent: Wednesda February 26, 2014 10:33 AM
To: •
Subject: Re: JEGE 9083E
Hi Scott,
You can delete the Main Battery overhauls. I didn't see the R&R and related tasks for engines 1 and 3? Is that included, or
a separate proposal?
The 100 mhr. cap is good.
Larry
----Original Message
From: Larry Visoski <
To: Larry Morrison <
Sent: Tue, Feb 25, 2014 2:10 pm
Subject: Fwd: JEGE 908JE
Hi Lar
Does this look accurate ?
Thx
Lar V
Sent from my iPhone
Begin forwarded message:
From: "JR Stambaugh"
Date: February 25, 2014 at 1:36:01 PM EST
To: "Larry Visoski"
Subject: Re: JEGE 908JE
Reply-To: "JR Stambaugh"
Larry,
Please find attached the induction invoice for N90BJE along with your 2014 SOA. The invoice covers the 50% induction payment as well
as the costs for the Boeing SB Top Kit.
Thanks, and have a great day.
JR Stambaugh
Accountable Manager
Stambaugh Aviation
CRS#EB1R107K
From: Larry Visoski
Sent: Tuesday, February 25, 2014 1:19 PM
To: Scott Stambau h
Cc: mailto: ; JR Stambaugh
Subject: Re: JEGE 908JE
Hello Scott,
I'm planning on bringing the Boeing to Brunswick on Monday, March 3, to start the inspection can you provide an input depaut invoice
for the input money that I need to pay you to get the ball rolling thank you Larry
Sent from my iPhone
On Feb 19, 2014, at 10:22 AM, "Scott Stambaugh" > wrote:
EFTA01189581
Attached is the pricing for the c check and all ADs. I will put together the pricing for the additional items Glenn sent
and forward that on.
Below is the pricing for the SB kit for compliance with AD 2009-05-03 (SB 727-28A-0128 fuel boost pump GFI relays).
These materials for the GFI kit are not in the C check number in the bid. We have completed about 13 of these
modifications already and have the long lead time parts in stock. So we won't have any lead time issues.
Part Number Description Cost per QTY Total
65C38468-15 TOP KIT $25,900.00 1 $25,900.00
KDAG-X4F-001 GFI RELAYS $2,880.00 8 $23,040.00
61-12905-51 SUPP.HARDWARE KIT $225.00 1 $ 225.00
BACC45FN24-43P6 CONNECTOR $69.00 3 $207.00
BACC45FN24-43P9 CONNECTOR $72.03 3 $216.09
BACC45FN24-43P10 CONNECTOR $72.03 3 $216.09
From: [mailto:
Sent: Monday, February 17, 2014 10:22 AM
To:
Subject: Fwd: JEGE 9083E
Scott,
Please see Glen's additional items to get 908JE through to it's next "C" check after this one.
Larry
Original Message
From: Glen Webb
To: jetcare <
Sent: Thu, Feb 13, 2014 1:03 pm
Subject: RE: JEGE 908JE
Hi Larry,
I've attached a report listing those items that will not make it to the next check in Feb 2016. These are items that can be
done during the 2A next year or done at Stambaugh as an AWR. Everything else is in the package I already put
together.
Glen
From: (sS
rr in
Sent: Thursday, February 13, 2014 10:14 AM
To:
Subject: JEGE 908JE
Hi Glen,
Can you please build me an updated maintenance package for 908JE. Lees look at cleaning it up for24 months if we
don't get into anything additional major. We are going to do the no.1 and 3 engines at this time as well.
Mike Miejer will be contact you for engine information on the 183 . It is OK to forward whatever he requests. Looks like
EFTA01189582
the Boss is willing to dump some money back into the Ole girl.
Call me with any questions or to discuss the package. The aircraft will be going to Stambaugh within the next week.
Larry
<JEGE C check 2-19-14.xls>
EFTA01189583
ℹ️ Document Details
SHA-256
a92e2ba3ef5af8545bba5f51d774daf8bf6165b91402315279ff7ba02580883c
Bates Number
EFTA01189580
Dataset
DataSet-9
Document Type
document
Pages
4
Comments 0