EFTA01078083.pdf

DataSet-9 1 page 135 words document
P23
👁 1 💬 0
📄 Extracted Text (135 words)
-A€1 ATELIER 8 July 2014 RE: Schedule Proposed Renderings: Dining Room (1) 3D perspective (1) Rendered Plan Stair Hall (3) 3D perspectives: 1" looking toward staircase; 2nd looking toward fireplace; 3ed looking at Upstairs Hall (1) Rendered Plan Entry (1) Rendered Plan and Elevation Entry Office (1) 3D Perspective (1) Rendered Plan (1) 2D Rendering of the Elevation as one enters the residence thru the Stair Hall into Dining Room Proposed Schedule: End of August-Early September: 1" round of renderings presented, design is refined End of September-Early October: rd round of renderings presented, design is refined If required, End of October: 3a round of renderings presented If not, mid-October design approved Mid Oct-December — prepare documentation for pricing December/January 2015 — pricing January 2015 — begin construction Amy Cassell Atelier, LCC, Chicago, IL 60657 EFTA01078083
ℹ️ Document Details
SHA-256
a957e5673855126ca38ddee40684e18c2ce27b92a9ca8bd1ed7955f10330df31
Bates Number
EFTA01078083
Dataset
DataSet-9
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!