EFTA02713947
EFTA02713949 DataSet-11
EFTA02713954

EFTA02713949.pdf

DataSet-11 5 pages 1,502 words document
P17 V11 P23 V16 P19
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (1,502 words)
Subbase D dock Inc. Invoice T: PO Box 4429/ Parcel 162 Subbase Date Invoice # 4/23/2015 6812 Bill To: Customer Phone LSJ,LLC Customer Fax Customer E-mail We accept cash, P.O. No. Project Terms chat s. major credt cards. travelers checks and wired funds. More info Ann/Boscoe Big N/LSJ Barge Upon Completion available regarding wired monies. Qty!Hrs Description Rate Amount REVISED 05/04/2015 Subbase and Island Rigging and Hydraulics reviewed projects that were on your "to do list" this morning. I will list all projects that I can with a quote for each repair but first I would like to comment on the condition of the LSJ Barge. This vessel was hauled out at our yard three years ago . During that haul out Subbase quoted on most of the items you have in this current list. It was surprising to sec that our recommendations were not completed and as a result the current condition of the vessel is not seaworthy. The overall appearance of the vessels is that it looks neglected and repairs that were essential were cobbled together in an effort to get by. The LSJ Barge needs a major overhaul to make her seaworthy and to ensure an extended service life. Subbase in not interested in making any repairs that will not be done properly; nor are we interested in patching anything together for a temporary fix. I understand that some projects may be more important then others so I will try to list each project individually. I Drydock hauling fees 1,500.00 1,500.00 45 Laydays: Approx 45 250.00 11,250.00 I Electricity Fee: Hook Up 75.00 75.00 45 Electricity Fee: per day 60.00 2,700.00 I 5000 psi pressure wash 327.00 327.00 Thank you for your business. Total Please note Subbase Drydock Inc. reserves the right to not release any Payments/Credits part/parts, projects or vessels for which/on which the above detailed work has been performed untilpayment in full is received. Balance Due Page 1 EFTA_R1_02138294 EFTA02713949 Subbase D dock Inc. Invoice T: PO Box 4429/ Parcel 162 Subbase Date Invoice # 4/23/2015 6812 Bill To: Customer Phone LSJ,LLC Customer Fax Customer E-mail We accept cash, P.O. No. Project Terms chat s. major credt cards. travelers checks and wired funds. More info Ann/Boscoe Big N/LSJ Barge Upon Completion available regarding wired monies. Qty!Hrs Description Rate Amount I 1 & 2. )Rudders: Subbase personnel examined the rudder room and we were able see major 45,000.00 45.00(1.00 corrosion on the transom. The hull plating has holes where sea water is seeping into the vessel. The steering components need to be removed and cleaned, the rudders need to be removed and serviced. The lower Pintle and gudgeons need service as well as the rudder stuffing box. Upon removing the rudders Subbase Drydock has determined that the bolt holes on each of the flanges on the rudders have been severely worn and have to be cropped out and replaced with new. In addition the tiller arm quadrants are completely rusted and not salvageable these have to be replaced. We have cut out the corroded plating on the stem and in doing so we had to remove the stem rubrail. All the hardware for the rub rail i.e....bolts and nuts... have to be replaced and new hardware used to reinstall rub rail. $45,000 includes labor and material I 3-A.) Install two cylinders with stainless steel shafts; including allhoses back to engine 95,000.00 95,000.00 room, with stainless steel ends on all hoses. Upon inspecting the engine room all the hydraulic lines have to be replaced this includes the steering hydraulics and pump. Labor and Materials will be S95,000 Please contact Island Rigging and Hydraulics for a more detailed estimate. I 3-B.) The steel boxes that secure the cylinders to the hull are deteriorated and will need 16.000.00 16,000.00 replacement. Subbase recommends using stainless steel to eliminate the corrosion. Three years ago we quoted $16,000.00 for both boxes and we will still honor this quote. Thank you for your business. Total Please note Subbase Drydock Inc. reserves the right to not release any Payments/Credits part/parts, projects or vessels for which/on which the above detailed work has been performed untilpayment in full is received, Balance Due Page 2 EFTA_R1_02138295 EFTA02713950 Subbase D dock Inc. Invoice T: PO Box 4429/ Parcel 162 Subbase Date Invoice # 4/23/2015 6812 Bill To: Customer Phone LSJ,LLC Customer Fax Customer E-mail We accept cash, P.O. No. Project Terms chat s. major creel t cards. travelers checks and wired funds. More info Ann/Boseoe Big N/LSJ Barge Upon Completion available regarding wired monies. Oty/Hrs Description Rate Amount I 4.) The exhaust system is in a non-repairable condition and nods replacement from the 24,500.00 24,500.00 main engine to the hull outlet. Our quote will include all new piping, flex joints, exhaust mixers, and new exterior aluminum outlet. When system is complete it will be wrapped with a removable wire mesh hi-temp blanket. The new system will be much quieter than the existing exhaust system. Labor and material $24,500 I 5.) Engine mounts need to be de-scaled of rust. Bolts holding mounts need to be cleaned or 7,000.00 7.000.00 renewed and alignment from coupling to shaft needs to be checked and adjusted for proper tolerances. An extensive review was completed of this drive train back in 2012 with repair recommendations made at that time. (before exhaust system is finalized this alignment must be done). 7000 Labor and Material I 6.) Stuffing boxes: Subbase was informed that new stuffing boxes are on hand and will be 5,000.00 5,000.00 owner supplied, after haulout removal of hose joining stuffing box to shaft log will reveal the condition of shaft log. I would reserve 5k for this project. I 7.) Cutless bearings require removal of main shafts and propellers: After removal of 4,150.00 4,150.00 coupling, shafts and props a condition report will follow if drive train is serviceable the routine maintenance for renewing cutless bearing will only need attention. Labor and material for this is (both port and starboard) $4,150.00. I 8.) Engine Cooling Grid: Pressure test system and issue report for this service. Reserve 1,200.00 1,200.00 $1,200.00 I 9.) Bottom paint and barrier coat: Labor and material $7,500.00. 7,500.00 7,500.00 Thank you for your business. Total Please note Subbase Drydock Inc. reserves the right to not release any Payments/Credits part/parts, projects or vessels for which/on which the above detailed work has been performed untilpayment in full is received. Balance Due Page 3 EFTA_R1_02138296 EFTA02713951 Subbase D dock Inc. Invoice T: PO Box 4429/ Parcel 162 Subbase Date Invoice # 4/23/2015 6812 Bill To: Customer Phone LSJ,LLC Customer Fax Customer E-mail We accept cash, P.O. No. Project Terms chat s. major credt cards. travelers checks and wired funds. More info Ann/Boseoe Big N/LSJ Barge Upon Completion available regarding wired monies. Qty/Hrs Description Rate Amount 10.) Engine and marine gear - Review upon haul out — QUOTE WILL BE ISSUED -- 0.00 0.00 I I I.) Fuel tank: Cleaning and disposal 2,800.00 2,800.00 I 19.) Clean engine room: Before any repairs are started clean and degrease entire engine 5.500.00 5,500.00 room, dispose of oily water. After repairs arc complete clean and paint engines and any other areas that were painted. Remove engine hatch covers and assess condition. Make necessary repairs and reinstall after all. Labor and material $5,500.00 I 20.) Ilydraulic Tank: Due to severe corrosion of the steel hydraulic tank, Subbase 5,000.00 5.000.00 reccomends replacing tank with new marine grade aluminum tank complete with all necessary fittings and sight glass to view levels. Labor and Materials. 1 21.) Engine Room Wiring: Upon an inspection of the engine room. Subbase Drydock has 37,000.00 37.000.00 determined that all of the engine room wiring is compromised. We will strip all the wiring and renew all bilge pumps. engien room blowers, lighting and batteries. This also includes running new gauges to pilot house and all new wiring to instrument control panel. Repairing 24 volt alternator and adding second one to port engine. Labor and Materials. I Shipping and Freight Charges 2,500.00 2.500.00 •"One-third due at mobilization, one-third at 50% completion and balance at completion*" Thank you for your business. Total Please note Subbase Drydock Inc. reserves the right to not release any Payments/Credits part/parts, projects or vessels for which/on which the above detailed work has been performed untilpayment in full is received. Balance Due Page 4 EFTA_R1_02138297 EFTA02713952 Subbase D dock Inc. Invoice T: PO Box 4429/ Parcel 162 Subbase Date Invoice # -1,232015 6812 Bill To: Customer Phone LSJ,LLC Customer Fax Customer E-mail We accept cash, P.O. No. Project Terms checks. major credt cards. travelers checks and wired funds. More info Ann/Roscoe Big N/LSJ Barge Upon Completion available regarding wired monies. Qty!Hrs Description Rate Amount Discount - as negotiated -14.002.00 -14.002.00 Thank you for your business. Total $260,000.00 Please note Subbase Drydock Inc. reserves the right to not release any Payments/Credits -5201,157.00 part/parts, projects or vessels for which/ on which the above detailed work has been performed untilpayment infull is received. Balance Due 558,843.00 Page 5 EFTA_R1_02138298 EFTA02713953
ℹ️ Document Details
SHA-256
aaaa00197d0e8486d9f83646db5c5959684946f1ffab770c65cf6b148833a8a9
Bates Number
EFTA02713949
Dataset
DataSet-11
Document Type
document
Pages
5

Comments 0

Loading comments…
Link copied!