EFTA01192719
EFTA01192720 DataSet-9
EFTA01192721

EFTA01192720.pdf

DataSet-9 1 page 246 words document
V16 P17 P19
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (246 words)
From: Daphne Wallace To: Jeffrey Epstein <[email protected]> Cc: Rich Kahn Subject: Fwd: FW: Little St. James Date: Fri, 29 May 2015 20:49:33 +0000 Attachments: A1.0.pdf; C 1.0.pdf Greetings Sir, For your review and comments, the revised drawings of the Maintenance/Workshop Building. Respectfully, Daphne Forwarded message From: John P. Woods, AIA Date: Fri, May 29, 2015 at 3:45 PM Subject: FW: Little St. James To: Da hne Wallace , Cecile deJongh < >, Ann Rodriquez Daphne, Attached are the revised site and floor plans for the Maintenance/Workshop Building. The changes are based upon the site visit held yesterday with Mr. Epstein. He requested a storage addition to be placed at the northern end of the building. We have placed that addition at the center of the northern facade as the most strategic location for the addition. If we place it further to the west, it will interfere with the access driveway leading to the main residence. If we place it further to the east, it will be too close to the edge of the abutment, in an area where the soil appears to be unstable. Upon approval of the plan, we will finish the drawings for the CZM Permit application. JPW Original Message From: JAREDIAN DESIGN GROUP [mailto Sent: Friday, May 29, 2015 3:11 PM To: John P. Woods Subject: Little St. James JAREDIAN DESIGN GROUP Architects, Engineers and Construction Managers =Fax This email is free from viruses and malware because avast! Antivirus protection is active. EFTA01192720
ℹ️ Document Details
SHA-256
aadc69894d67242461282bc2a75cca97ad44c9b431fa923f2334ee7bd109a570
Bates Number
EFTA01192720
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!