📄 Extracted Text (246 words)
From: Daphne Wallace
To: Jeffrey Epstein <[email protected]>
Cc: Rich Kahn
Subject: Fwd: FW: Little St. James
Date: Fri, 29 May 2015 20:49:33 +0000
Attachments: A1.0.pdf; C 1.0.pdf
Greetings Sir,
For your review and comments, the revised drawings of the Maintenance/Workshop Building.
Respectfully, Daphne
Forwarded message
From: John P. Woods, AIA
Date: Fri, May 29, 2015 at 3:45 PM
Subject: FW: Little St. James
To: Da hne Wallace , Cecile deJongh < >, Ann Rodriquez
Daphne,
Attached are the revised site and floor plans for the Maintenance/Workshop Building. The changes are based
upon the site visit held yesterday with Mr. Epstein. He requested a storage addition to be placed at the northern
end of the building. We have placed that addition at the center of the northern facade as the most strategic
location for the addition. If we place it further to the west, it will interfere with the access driveway leading to
the main residence. If we place it further to the east, it will be too close to the edge of the abutment, in an area
where the soil appears to be unstable. Upon approval of the plan, we will finish the drawings for the CZM Permit
application.
JPW
Original Message
From: JAREDIAN DESIGN GROUP [mailto
Sent: Friday, May 29, 2015 3:11 PM
To: John P. Woods
Subject: Little St. James
JAREDIAN DESIGN GROUP
Architects, Engineers and Construction Managers
=Fax
This email is free from viruses and malware because avast! Antivirus protection is active.
EFTA01192720
ℹ️ Document Details
SHA-256
aadc69894d67242461282bc2a75cca97ad44c9b431fa923f2334ee7bd109a570
Bates Number
EFTA01192720
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0