Here is the game plan:
The Com Tech's are currently un-
boxing the new hardware and getting the equipment in the new racks. Need power and network drops and IP Add
resses to the new racks. Need to make sure the existing coax jumpers from the old recorders will reach the new r
acks for cutover between old equipment and new.
from SigNet will be on site Monday. He will be sending NCIC forms.
The old system will run continuing to record the existing remaining channels until the new system is ready for c
utover. First priority is to restore recording to all channels. Redundancy/PTZ control etc. will be converted once r
ecording is restored.
The existing analog matrix switch will remain for PTZ control and PLC camera call up.
I will provide an update once we are on-site and assess current site conditions.
I Federal Sales Representative
SigNet ec nologies I Convergint Federal Solutions
12300 Kiln Ct Suite E, Beltsville, MD 20705
This e-
mail and any attachments to it are intended only for the identified recipients. It may contain proprietary or other
wise legally protected information of SigNet Technologies, Inc. Any unauthorized use or disclosure of this comm
unication is strictly prohibited. If you have received this communication in error, please notify the sender and del
ete or otherwise destroy the e-mail and all attachments immediately.
EFTA00142539
ℹ️ Document Details
SHA-256
ac275d98deab7fee66770f20c6511e0c7f34a7eacf0862d8d2c6e5a121c9633c
Bates Number
EFTA00142539
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0