EFTA02311183
EFTA02311184 DataSet-11
EFTA02311186

EFTA02311184.pdf

DataSet-11 2 pages 612 words document
P17 P23 V16 V11 P18
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (612 words)
JE Punch List —June 11, 2012 1. Five Palms —TOP PRIORITY - Exterior Door Shutters — removable option - Painting - outside to be completed after visit - Piano - needs tuner - Lights - add two more lights to front of Five Palms in trees - Mirrored siding — Panels sailed 6/8, EDA on STT 6/12 - Glue on site - Tapestry Molding for Ceiling — Ion - Transformer building — Building 5/31, 5/25 — final electrical hookup 6/8 — temporarily powered by generator - Flooring - Books — books on site will relocate over the week of 6/4 - Benches —one bench to west north of fire pit - Road grading - Piano —at Tropical FL 6/8 — scheduled to sail 6/13, EDA on STT 6/16 2. Grotto- - Floor resin - Genset wiring— scheduling to be determined 3. Berm/Top of Hill - dirt and rock needs on top of hill needs to go ASAP - hydroseed top of hill —4 large planter boxes with small planter inside require construction — size to be determined by JE - cleanup and excavate — continues - remove rock screener — completed - run power to berm center from pull box 4. Engineering/Maintenance Yard - Steel Shed — foundation in progress - Metal Sheets - on old building will be replaced week of 6/4 5. Triangle — landscaping direction required from JE 6. Flagpole Pool Caba°~ - Recovering of sofa/chairs - Furniture — needs new de 7. Entry Tree Lights — installati n complete 8. Solutions for Generators — Sound proofing solution forwarded to JE, require direction, wall built 9. Tiki — Darren is contacting the vendor regarding the shields 10. Dock — - Decking — replace all damaged boards and carpet - complete - Floating Dock - - Jet ski Docking - review - Table/Dock Box — Bill starting 6/4 11. Kite House— review of wooden outside furniture - 12. Chillax Room - requires furniture piece for electrical/media equipment 13. Chillax Bathroom - requires blue rugs for bathroom & vanity area 14. Mechanical Building - Replacement Transformer - estimated date to be shipped from factory (Illinois) 8/21 EFTA_R1_01196876 EFTA02311184 15. Boats - Midnight Express — purchase Yamaha 300 motors, install by Offshore Marine - PRD — sell - Lady G — sell - Big N - sell - Calypso — refurbish 16. Gym Road - road grading after Five Palms — continues 17. Timers — review installing timers on air conditioners, irrigation water systems, and lights 18. Beach lighting — per JE, replace existing transformers for the beach lighting of palms around the salt pond and beach 19. Pergolas — construct 3 pergolas for benches at the top of the hill —continues 20. Main entrance/gravel/grade - complete 21. Wind Door — wind door on kitchen side needs adjusting - wind door stops 22. Landscaping — gardenias 23. Solar lights 24. Roads — grade all roads — Wednesday 6/6 — Tom please review all roads so you can pitch, drain, with Jules 25. Library — lights on bookshelves need attention - temperature? 26. Main hill — asphalt path 27. Master Suite — - Large master bed planting - Door in dressing area — the heavy mirrored door between the bed and bath is beginning to drag on the floor - Add door handles to shutters on master bedroom door to be able to close from inside 28. Phones — - Library terrace — phone does not work — repaired 6/11 - Flagpole — phone in cabana has all the wrong numbers as compared to the list on speed dial — label replaced 29. Media — sign up for Blockbuster, VUDU, HULU EFTA_R1_01196877 EFTA02311185
ℹ️ Document Details
SHA-256
ac2f98de50354ab2c7a30e222dce1735f912915cdf2a9609e329684c4f53be41
Bates Number
EFTA02311184
Dataset
DataSet-11
Document Type
document
Pages
2

Comments 0

Loading comments…
Link copied!