EFTA02443793.pdf
👁 1
💬 0
📄 Extracted Text (212 words)
To: J EpsteinUeevacation mail.com
• n J;
From: Brice Gordon
Sent: Wed 6/17/2009 6:02:29 AM
Subject: LSJ
To: JEE
Would like the recommend the following:
1.Ritchen to be emptied of all equipment and supplies ASAP Gerry can start
painting.
2.All outside sofa's ( White ) main compound go into storage and start prep for
painting of ext doors and shutters on all buildings except master bedroom, next
week.
3.Have contacted tile installer for bedroom 2, we just need to get material, will
sort/source today.
4.Basic plan is to have bedroom 2 completed by the 6th July and concentrate and
refurbishment of 3, i.e. paint etc, with completion by the 15th July .
5.Wil1 be talking to paint contractor today, recommended by Tom M for
refurbishment of main compound.
6. Employ more cleaning/laundry staff x2 by the 6th to assist in setting up
compound.
7. Chef to be on island by the 15th to sort out kitchen and supplies.
8. Move Gym office on the 30th of June. Noting LSJ admin to Blue Beach Cottage,
Are we to acquire new space for construction office space at Red hook or should
we put office equipment into storage.?
9. All visitors from today onwards to be accommodated on STT.
For your consideration
Brice
EFTA_R1_01519289
EFTA02443793
ℹ️ Document Details
SHA-256
ad78a4e8a3f3b6617cadde4db94cf6192258b4b8c6f4659d3c3c89a7e2e685d4
Bates Number
EFTA02443793
Dataset
DataSet-11
Type
document
Pages
1
💬 Comments 0