EFTA00595156
EFTA00595159 DataSet-9
EFTA00595160

EFTA00595159.pdf

DataSet-9 1 page 170 words document
V16 V15 P17 P19
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (170 words)
Emad Hanna From: Sent: Friday, uecemoer 04, 2009 9:22 AM To: Emad Hanna Subject: Fwd: Fountain Emad this is approved for payment. Requesting a wire transfer for next week, any questions please call Thx Original Message Fro • et To: Sent: Tues. Nov 24. 2009 11:16 am Subject: Fountain Brice, I am re-submitting this request for change order. There was more labor involved to expose areas for both the electrician and plumber. We added additional reinforcing, instead of using wire welded mesh, we used a rebar mat, spaced 1' x 1' on center. We mixed in an additive into the the concrete mix design to waterproof it and did two (2) 7" pours. We formed the interior to allow the estancia to continue to drain and installed angle iron to install drain grates. We mixed all the concrete on site because the local plants would not make that mix design for a small quantity. price of change order is 2400.00 plus tax Thank you *X imbo 7-oRko 41-se( 1 EFTA00595159
ℹ️ Document Details
SHA-256
af6be20ca23b0b460ce4073c5bcfdc1ef5b8adbf93824cfae0516027904a57c4
Bates Number
EFTA00595159
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!