Emad
this is approved for payment.
Requesting a wire transfer for next week, any questions please call
Thx
Original Message
Fro • et
To:
Sent: Tues. Nov 24. 2009 11:16 am
Subject: Fountain
Brice,
I am re-submitting this request for change order. There was more labor involved to expose areas for
both the electrician and plumber. We added additional reinforcing, instead of using wire welded
mesh, we used a rebar mat, spaced 1' x 1' on center. We mixed in an additive into the the concrete
mix design to waterproof it and did two (2) 7" pours. We formed the interior to allow the estancia to
continue to drain and installed angle iron to install drain grates. We mixed all the concrete on site
because the local plants would not make that mix design for a small quantity.
price of change order is 2400.00 plus tax
Thank you
*X imbo
7-oRko 41-se(
1
EFTA00595159
ℹ️ Document Details
SHA-256
af6be20ca23b0b460ce4073c5bcfdc1ef5b8adbf93824cfae0516027904a57c4
Bates Number
EFTA00595159
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0