📄 Extracted Text (497 words)
Amendment #4 Page 699 of 868
I .ble .2f Cnnfrri
Hidroelectrica Santa Cruz S.A.C.
Notes to the financial statements
Asa December 31.2014 and 2013
identeemon and business 'tinily
(a) Idenattadon
Hi&oelectnca Santa Cruz S A C (hereefter 'the Company') is a Penmen entity incorporated on December 21. 2006, in the csty of Lire. substdary ct Labn
Amerce Power Peru S AC (a Sitwaary of Lath America Power Holding B V.. domiciled tire Netherlands), when holds 65.7 percent of the voting shares
of the Company s capital stock (a 30 54 percent direct participation and a 35 16 percent irdrea parocpaton fl own FtSC Holdng SAC )
(b) BUIIMOSS &cavity
The Company s dedicated to the generabon and sale of eleanaty d to local prate and state-owned companies. as well as to engineering salvoes, and
actors related to its business actiwty. Its legal dome,* Is Av. Pinar N' 152. &lona N' 508. Santiago de Surco. Lire, Peru.
As a December 31. 2014 and 2013, the Company is develop:mg the Santa Cruz III Hydroelectric Flare, whith is located all along the Santa Cris Faver
(C.araz armament of Ancash) Said plant we have 2 8 MW or generation capacity Construction stained in January 2015 and commercial operations are
es/detect to start by July 2016.
On Jaruary 12. 2012. and February 15. 2012. the Company started the commercial operations of Group 1 and Group 2. respectively. d the Huasahuasi I
Hydroelectric Plant. which has 10.0 MW of generaton capacity Said plait es boated in the basins d the Huasahiasi and Huacuas rivers. Huasaltosi
astnct. province of Tarma, deportment of Juan
On Apnl 18, 2012, and May 5, 2012, the Corrparre started the commercial operations of Group t and Group 2 respectniely, at the Huasanuasi II
Hyttoelectnc Plant, which has 10.0 MW of generation capacity. Said plants located m tie tests of tie Humanism and Huacuas avers, Htersahuasi
district. province of Tanis. department of Julia
In 2010. the Compere/ started operations a the Santa Cruz II Hydroeleane Plant res 7 4 MW ca generation capacity
In 2009, the Company started operations of the Santa Cruz I Hydoelectic Plant, which is located on the Santa Cruz River (15 Ion north ert the city of Carat.
department of Anent* Much has 60 MW of geremban capacity.
In 2008, the Compare/ entered to the Regime of Investment Promotion on °Wooly Generation by Ustg Renewable Energy Resouces (hereafter 'REF?).
through which the Oxrpany supplies the National Interconnected Electric System (SEIN under its Scenish acronym) with the energy generated by its four
hYdreeintee plants that ate canerni operating For the purpose. the Company and the Penman government signed RER contracts which have a 20-year
period maturity, which establish that through Ire mechanism of RER Auctions, the Company receives a Eked fee adjusted for lAPS5CP3500 rate ((Inked
goods less bad and energy) per megawatt established for each hydroelectnc plant
F-370
http://cfdocs.btogo. com:27638/cf/drv7/pub/edgar/2015/07/20/0001193 I 25-15-256461/d78... 7/20/2015
CONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e) DB-SDNY-0058656
CONFIDENTIAL SDNY_GM_00204840
EFTA01367128
ℹ️ Document Details
SHA-256
afdc4b2ee2dfdc275a0e534ade650529628b1975cf7cf9082fdf5ae0ab0faecd
Bates Number
EFTA01367128
Dataset
DataSet-10
Document Type
document
Pages
1
Comments 0