📄 Extracted Text (235 words)
Task List 12-23-2010
71st Street ( Request from Jeffrey )
Upgrade wireless network to Apple Based wireless Network and give coverage to
the whole property.
Set up and Build a Server Environment so Jeffrey can Sync all of his Macs Worldwide
Set up a cell network booster so Jeffrey, his Staff, and Guests can have better cell
phone reception.
Resolve the issues with printing for property.
All this must be done while maintaining the current Cisco, Citrix, locked down
authentication paths.
Deadline is Jeffrey's Return to 71st Jan 3rd, 2011
LSJ
The current network design does not give Jeffrey's Office Bandwith Priority so he is
getting network Connection issues, Solution: The office needs a server and a zero
config switch which is self contained on its own subnet To do this both office
locations on the Island need to be controlled by a master OSX server box connect to
an Asante switch ( a zero config sub switch ) this will give Jeffrey a Platform for a
more reliable connection, a move secure connection, and will allow to set up a back
up network through a cell connection. This was already tested when power and
internet went down I was able to provide data services through my cell phone and
macbook air.
Multiple Requests where made for hardware and software functionality for staff and
crew.
Jeffrey needs his imac upgraded from 10.5.8. to 10.6.5
EFTA01122843
ℹ️ Document Details
SHA-256
b02f88e4462549c16ec4229beaea61f20b1fd24f0c3df35e13745b5e747631a5
Bates Number
EFTA01122843
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0