📄 Extracted Text (217 words)
From: Larry Visoski
Sent: Tuesday, December 20, 2016 8:44 PM
To: Je vacation
Subject: GIV update
Jeffrey
Gulfstream has to manufacture the replacement angle that is corroded, delive=y date is Jan 4th.
Gulfstream engineering Savanah is reviewing the corroded area, taking into a=count the part is not available until Jan
4th, and not a saftey of flight i=sue, we hope to obtain a 30 day extension from Engineering to require us to=clean,
prime and install new rivets as temporary repair.
I'm told I will have firm answer later today.,
Pylon Precooler:
I spoke to Tech support, Gulfstream recommends doing a full system integrity=check of PreCooler system and cabin
pressurization, which includes installi=g a temporary digital temp sensor in the pylon to make sure hot air is trig=ering
the Pylon Precooler operation. Tech support suggest checking Air cycl= machine temperature outlet, since functionality
and temperatures of all pr=ssurization components have an effect on preCooler operation.
If we get the 30 day extension, I'd like to have Westfield, Savanah or Bruns=ick Gulfstream accomplish the corrosion
repair and accomplish Precooler che=k,.
If you agree?
Thx
Larry
Sent from my iPhone=<?xml version=.0" encoding=TF-8"?> <!DOCTYPE plist PUBLIC "-//Apple//DTD PLIST 1.0//EN"
"http://www.apple.com/DTDs/Propertylist-1.0.dtd">
<plist version=.0">
<dict>
<key>conversation-id</key>
<integer>59179</integer>
<key>date-last-viewed</key>
<integer>0</integer>
<key>date-received</key>
<integer>1482266632</integer>
<key>flags</key>
<integer>8590195717</integer>
<key>gmail-label-ids</key>
<array>
<integer>2</integer>
</array>
<key>remote-id</key>
<string>672342</string>
</dict>
</plist>
EFTA_R1_01916634
EFTA02665885
ℹ️ Document Details
SHA-256
b03456696deff7ef8b7eb60de3ac30d482e20cb5352afd6953bede135f71f3c3
Bates Number
EFTA02665885
Dataset
DataSet-11
Document Type
document
Pages
1
Comments 0