EFTA01028857.pdf
👁 1
💬 0
📄 Extracted Text (265 words)
From: J <[email protected]>
To: michael glidden
Subject: Re: Gsj septic
Date: Sun, 03 Feb 2019 21:23:47 +0000
Inline-Images: IMG_0264.JPG; IMG_0265.JPG; IMG_0266.JPG
can you call me
On Sun, Feb 3, 2019 at 4:21 PM michael glidden > wrote:
Good afternoon.
The first picture is of the system installed at the GSJ staff cottage. The installation is complete as far as Adam
Cook's and LSJ's responsability. The remaining piping from the buildings was within JPK's scope.
The second and third photos are of the main compound system that was just installed on Friday by Adam
Cook's men along with Jules in the excavator. There was not enough time to get the back filling done and
yesterday was devoted to moving trees from GSJ to LSJ. I had planned on completing the backfill on Monday
but have put off all plans for GSJ as instructed.
Let me know if you need more information.
MG.
Begin forwarded message:
From: michael glidden < >
Subject: Gsj septic
Date: February 3, 2019 at 5:04:56 PM AST
To:
Sent from my iPhone
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
EFTA01028857
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA01028858
ℹ️ Document Details
SHA-256
b04e4bb7031c539f1d6d21c2619a99427a2a7c210870ed2680f7b37d1392171b
Bates Number
EFTA01028857
Dataset
DataSet-9
Type
document
Pages
2
💬 Comments 0