From: Jermaine Ruan
Sent: Wednesday, March 2, 2016 12:41 AM
To: jeffrey E.
Cc: ann rodriquez
Subject: Choice internet
Good Evening Boss,
Allan, Omar, Hector and I finalized our meeting for the =eeded materials required to equip GSJ with internet in a few
=ays.
I =m requesting your permission to have a buried conduit pipe installed =unning from the GSJ solar farm to the Main
Complex (In house). This is =or Choice to pull the necessary cables down to the complex to complete =he network.
Allan and Hector are =onfident that they will be able to start on Thursday barring any =roblems. They will confirm
tomorrow.
Also Boss FYI:
As per our =iscussion on the dragonwave licensing procedure. My findings are as =ollows:
I spoke to Ms. =ardly at Micronet (the company that licensed your =irst dragonwaves) . They confirmed the timeframe
that =utureTech stated that this process does take from 30 - 90 =ays.
The reason was explained to me as follows:
1. FCC 601application is =illed out and submitted.
2. It is then processed =or an open sub-band frequency and filed with FCC
3. The FCC submit letters =o all private, federal, and public agencies to verify that the =ub-band will not interfere
with existing frequencies in the =icinity.
4. They are given =pproximately 30 days to reply.
5. If there isn't = complaint filed the sub-band frequency is released to be programmed =nto the radio.
a. If the complaint is =alid then the process between Micronet and the FCC is repeated.
I verified this =nformation with Hector and Allan during our meeting. They stated =pproximately the same steps, they
have to do this every time they order =ny kind of licensed radios.
Regards
EFTA_R1_01307466
EFTA02341609
ℹ️ Document Details
SHA-256
b09741a76eedbc1ed12795ce74aa57c3779f886ee51e4c128ccb7c1524500a36
Bates Number
EFTA02341609
Dataset
DataSet-11
Type
document
Pages
1
💬 Comments 0