📄 Extracted Text (3,135 words)
From: Lvjet 4 >
Sent: Thursday, January 9, 2014 4:57 AM
To: [email protected]
Subject: mounts
Jeffrey,
My records indicate Fwd mounts have been changed Dec 15, 2008 dur=ng engine overhaul,.
The L/H and R/H Aft mounts were changed in 1998 according to CMP repor= below,.,.
total time at this time: 8643
<https:=/cmp.mygulfstream.com/Images/minus.gif> 712061 (P) Airframe Vibration
Isolator (Left Forward Mount, F=rward) - Removal / Installation
P/N: 94756-04 S/N: 5541 MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Event Category
Part (P) PN 94756.04 Enter Part Number
C/W
Hrs: 7178.6
Lnd: 3292
Date: 15 Dec 2008
Freq <javascript:op=nCustomFreq(3415926);>
SN
Mfg Ref Number: 71-01-00
Doc: GIV AMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="DocLinks" style="width: 180px; font-family: adal; font-si=e: 8pt;">DocumentsAMM 712061Task=20
Card <javascript:openComplmageLoadere34159261> Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06=Dec 2012 13:15 Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumber=712061> OEM Labor Hours:4.0
Mx. Notes: Special Notation: Show Related=Codes Show Part Detail= S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value=3D"on">Ops Spec
Hours: Initial Frequency: N/A
Cycles: Recurring Frequency:<=font> N/A Next due was not adjusted. <=tr>
Date: Frequency Tolerance:<=font> N/A
EFTA_R1_01393785
EFTA02379919
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer: Install=20 Status: RB - RebuiltR - Repairedl - InspectedM - ModifiedN - NewO -
Overhauled Current Part Run Time: Hours Landings Months
TSN
TSO
TSR
Vendor:=nbsp; Mod Sta=us:
HW Vers=on: Part Warranty:
SW Vers=on: Labor=20 Warranty:
Maint T=g: Airframe Time =t Install
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours Cycles [ =onths or Date]
TSN: <javascript:doNothing();> </=> <javascript:doNothing();>
TSR: <javascript:doNothing();> atd>
New Cos=: $1,750.34
Overhau=ed:
Repaire=:
OEM Ven=or: BARRY CONTROLS AEROSPACE Install=20 Notes: ATA 712061 Compliance History
Part ON # Serial ON # CW Hrs CW Cyc CW Date Actual Cost Work Order #
Part OFF # Serial OFF # Remark / Malfunction Actual Labor Facility
94756-04 ON : 5541 7,178.6 3,292 15 Dec 2008 0.00 [view]
<javascript:openComplHistE=itor( '3415926', 18903364)>
<javascript:openCompHistImageLoader( '3415926',='18903364' )>
OFF: 0.00
94756-04 ON : 3,601.0 1,644 11 Dec 1998 0.00 [view] <javascript:openComplHistE=itor(
'3415926', 1306914 )>
<javascript:openCompHistImageLoader( '3415926',='1306914' )>
OFF: 0.00 GAC-APP
ON : 94756-04 ON : 0.0 0 07 Dec 1988 0.00 [view]
<javascript:openComplHistE=itor( '3415926', 5283603 )>
<javascript:openCompHistImageLoader( '3415926',='5283603' )>
0.00
=/div>
<https:=/cmp.mygulfstream.com/Images/minus.gif> 712062 (P) Airframe Vibration
Isolator (Left Forward Mount, A=t) - Removal / Installation
P/N: 94756-04 S/N: 5537 MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Event Category
Part (P) PN 94756-04 Enter Part Number
C/W
2
EFTA_R1_01393786
EFTA02379920
Hrs: 7178.6
Ind: 3292
Date: 15 Dec 2008
Freq <javascript:op=nCustomFreq(3414655);>
SN
Mfg Ref Number: 71-01-00
Doc: GIV AMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="Doclinks" style="width: 180px; font-family: adal; font-si=e: 8pt;">DocumentsAMM 712061Task=20
Card <javascript:openComplmageloadere34146551> Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06=Dec 2012 13:18 Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumber=712062> OEM Labor Hours:4.0
Mx. Notes: Special Notation: Show Related=Codes Show Part Detail= S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value=3D"on">Ops Spec
Hours: Initial Frequency: N/A
Cycles: Recurring Frequency:<=font> N/A Next due was not adjusted. <=tr>
Date: Frequency Tolerance:<=font> N/A
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer: Install=20 Status: RB - RebuiltR - Repairedl - InspectedM - ModifiedN - NewO -
Overhauled Current Part Run Time: Hours Landings Months
TSN
TSO
TSR
Vendor:=nbsp; Mod Sta=us:
HW Vers=on: Part Warranty:
SW Vers=on: Labor=20 Warranty:
Maint T=g: Airframe Time =t Install
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours Cycles konths or Date ]
TSN: <javascript:doNothing();> </=> <javascript:doNothing();>
TSR: <javascript:doNothing();> <=td>
New Cos=: $1,750.34
Overhau=ed:
Repaire=:
OEM Ven=or: BARRY CONTROLS AEROSPACE Install=20 Notes: MAN
<https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Event Category
3
EFTA_R1_01393787
EFTA02379921
Part (P) PN 94756.94756.13 Enter Part Number
C/W
Hrs: 3601.0
Lnd: 1644
Date: 11 Dec 1998
Freq <javascript:op=nCustomFreq(3417398);>
SN
Mfg Ref Number: 71-01-00
Doc: GIVAMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="DocLinks" style="width: 180px; font-family: arial; font-sire: 8pt;">DocumentsAMM 712061Task=20
Card <javascript:openComplmageLoadere34173981> Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06=Dec 2012 13:21 Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumber=712063> OEM Labor Hours:4.0
Mx. Notes: FREQ DETERMINED BY P/N Special Notation: Show Related=Codes Show Part Detail=
S=ow C/W Adjustments
C/W Adjustments=/span>
airframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type='checkbox" checked=""
value=3D"on">Ops Spec
Hours: Initial Frequency: N/A
Cycles: Recurring Frequency:<=font> N/A Next due was not adjusted. <=tr>
Date: Frequency Tolerance:<=font> N/A
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer: InstalI=20 Status: RB RebuiltR Repairedl InspectedM ModifiedN - NewO -
Overhauled Current Part Run Time: Hours Landings Months
TSN
ISO
TSR
Vendor:=nbsp; Mod Sta=us:
HW Vers=on: Part Warranty:
SW Vers=on: Labor=20 Warranty:
Maint T=g: Airframe Time =t Install
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours Cycles I =onths or Date j
TSN: = <javascript:doNothing();> </=> <javascript:doNothing();>
TSR: <javascript:doNothing();> <=td>
New Cos=: $1,747.28
Overhau=ed:
Repaire=:
4
EFTA_R1_01393788
EFTA02379922
OEM Ven=or: BARRY CONTROLS AEROSPACE Install=20 Notes: MAN
<https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Event Category
Part (P) PN 13636.94756.0394756.13 Ent=r Part Number
C/W
Hrs: 3601.0
Lnd: 1644
Date: 11 Dec 1998
Freq <javascript:op=nCustomFreq(3417344);>
SN
Mfg Ref Number: 71-01-00
Doc: GIV AMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="DocLinks" style="width: 180px; font-family: arial; font-si=e: 8pt;">DocumentsAMM 712061Task=20
Card <javascript:openComplmageLoadert34173441> Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06=Dec 2012 13:23 Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumber=712064> OEM Labor Hours:4.0
Mx. Notes: FREQ DETERMINED BY P/N Special Notation: Show Related=Codes Show Part Detail=
S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value=3D"on">Ops Spec
Hours: Initial Frequency: N/A
Cycles: Recurring Frequency:<=font> N/A Next due was not adjusted. <=tr>
Date: Frequency Tolerance:<=font> N/A
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer: Install=20 Status: RB RebuiltR - Repairedl - InspectedM ModifiedN - NewO -
Overhauled Current Part Run Time: Hours Landings Months
TSN
TSO
TSR
Vendor:=nbsp; Mod Sta=us:
HW Vers=on: Part Warranty:
SW Vers=on: Labor=20 Warranty:
Maint T=g: Airframe Time =t Install
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours Cycles l =onths or Date)
TSN: = <javascript:doNothing();> </=> <javascript:doNothing();>
TSR: <javascript:doNothing();> <=td>
New Cos=: $1,747.28
5
EFTA_R1_01393789
EFTA02379923
Overhau=ed:
Repaire=:
OEM Ven=or: BARRY CONTROLS AEROSPACE Install=20 Notes: ATA 712064 Compliance History
Part ON It Serial ON # CW Hrs CW Cyc CW Date Actual Cost Work Order #
Part OFF # Serial OFF # Remark / Malfunction Actual Labor Facility
ON : 94756-13 ON : 2982 3,601.0 1,644 11 Dec 1998 0.00 (view)
<javascript:openComplHistE=itor( '3417344', 2664578)>
<javascript:openCompHistImageLoader( '3417344',='2664578' )>
OFF : 13636-94756-03 OFF: 0521 0.00 GAC-APP
ON : 13636-94756-03 ON : 0521 0.0 0 07 Dec 1988 0.00 [view)
<javascript:openComplHistE=itor( '3417344', 5751294)>
<javascript:openCompHistImageLoader( '3417344',&5751294' )>
0.00
=/div>
<https:=/cmp.mygulfstream.com/Images/minus.gif> 712065 (P) Airframe Vibration
Isolator (Right Forward Mount, =orward) - Removal / Installation
P/N: 94756.04 S/N: 5536 MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Event Category
Part (P) PN 94756-04 Enter Part Number
C/W
Hrs: 7178.6
Lnd: 3292
Date: 15 Dec 2008
Freq <javascript:op=nCustomFreq(3417286);>
SN
Mfg Ref Number: 71-01-00
Doc: GIVAMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="DocLinks" style="width: 180px; font-family: axial; font-si=e: 8pt;">DocumentsAMM 712061Task=20
Card <javascript:openComplmageLoaderc34172861> Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06=Dec 2012 13:26 Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumber=712065> OEM Labor Hours:4.0
Mx. Notes: Special Notation: Show Related=Codes Show Part Detail= S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value=3D"on">Ops Spec
Hours: Initial Frequency: N/A
Cycles: Recurring Frequency:<=font> N/A Next due was not adjusted. <=tr>
Date: Frequency Tolerance:<=font> N/A
6
EFTA_R1_01393790
EFTA02379924
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer: Install=20 Status: RB - RebuiltR - Repairedl - InspectedM - ModifiedN - NewO -
Overhauled Current Part Run Time: Hours Landings Months
TSN
TSO
TSR
Vendor:=nbsp; Mod Sta=us:
HW Vers=on: Part Warranty:
SW Vers=on: Labor=20 Warranty:
Maint T=g: Airframe Time =t Install
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours Cycles [ =onths or Date]
TSN: <javascript:doNothing();> </=> <javascript:doNothing();>
TSR: <javascript:doNothing();> atd>
New Cos=: $1,750.34
Overhau=ed:
Repaire=:
OEM Ven=or: BARRY CONTROLS AEROSPACE Install=20 Notes: ATA 712065 Compliance History
Part ON # Serial ON # CW Hrs CW Cyc CW Date Actual Cost Work Order #
Part OFF # Serial OFF # Remark / Malfunction Actual Labor Facility
94756-04 ON : 5536 7,178.6 3,292 15 Dec 2008 0.00 [view]
<javascript:openComplHistE=itor( '3417286', 18903366)>
<javascript:openCompHistImageLoader( '3417286',='18903366' )>
OFF: 0.00
94756-04 ON : 3,601.0 1,644 11 Dec 1998 0.00 [view] <javascript:openComplHistE=itor(
'3417286', 1372783 )>
<javascript:openCompHistImageLoader( '3417286',='1372783' )>
OFF: 0.00 GAC-APP
ON : 94756-04 ON : 0.0 0 07 Dec 1988 0.00 [view]
<javascript:openComplHistE=itor( '3417286', 5308553 )>
<javascript:openCompHistImageLoader( '3417286',='5308553' )>
0.00
=/div>
<https:=/cmp.mygulfstream.com/Images/minus.gif> 712066 (P) Airframe Vibration
Isolator (Right Forward Mount, =ft) - Removal / Installation
P/N: 94756.04 S/N: 5538 MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Event Category
Part (P) PN 94756-04 Enter Part Number
C/W
7
EFTA_R1_01393791
EFTA02379925
Hrs: 7178.6
Ind: 3292
Date: 15 Dec 2008
Freq <javascript:op=nCustomFreq(3417626);>
SN
Mfg Ref Number: 71-01-00
Doc: GIV AMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="Doclinks" style="width: 180px; font-family: adal; font-si=e: 8pt;'500cumentsAMM 712061Task=20
Card <javascript:openComplmageloadere34176261> Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06=Dec 2012 13:29 Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumber=712066> OEM Labor Hours:4.0
Mx. Notes: Special Notation: Show Related=Codes Show Part Detail= S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value=3D"on">Ops Spec
Hours: Initial Frequency: N/A
Cycles: Recurring Frequency:<=font> N/A Next due was not adjusted. <=tr>
Date: Frequency Tolerance:<=font> N/A
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer: Install=20 Status: RB - RebuiltR - Repairedl - InspectedM - ModifiedN - NewO -
Overhauled Current Part Run Time: Hours Landings Months
TSN
TSO
TSR
Vendor:=nbsp; Mod Sta=us:
HW Vers=on: Part Warranty:
SW Vers=on: Labor=20 Warranty:
Maint T=g: Airframe Time =t Install
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours Cycles konths or Date ]
TSN: <javascript:doNothing();> </=> <javascript:doNothing();>
TSR: <javascript:doNothing();> <=td>
New Cos=: $1,750.34
Overhau=ed:
Repaire=:
OEM Ven=or: BARRY CONTROLS AEROSPACE Install=20 Notes: ATA 712066 Compliance History
Part ON # Serial ON # CW Hrs CW Cyc CW Date Actual Cost Work Order #
Part OFF # Serial OFF # Remark/ Malfunction Actual Labor Facility
8
EFTA_R1_01393792
EFTA02379926
94756-04 ON : 5538 7,178.6 3,292 15 Dec 2008 0.00 [view]
<javascript:openComplHistE=itor( '3417626', 18903367)>
<javascript:openCompHistlmageloader( '3417626',='18903367' )>
OFF: 0.00
94756-04 ON : 3,601.0 1,644 11 Dec 1998 0.00 (view] <javascript:openComplHistE=itor(
'3417626', 1874829 )>
<javascript:openCompHistImageLoader( '3417626',='1874829' )>
OFF: 0.00 GAC-APP
ON : 94756-04 ON : 0.0 0 07 Dec 1988 0.00 [view]
<javascript:openComplHistE=itor( '3417626', 5478663 )>
<javascript:openCompHistImageLoader( '3417626',&5478663' )>
0.00
=/div>
<https:=/cmp.mygulfstream.com/Images/minus.gif> 712067 (P) Airframe Vibration
Isolator (Right Aft Mount, Forw=rd) - Removal / Installation
P/N: 94756-13 S/N: 2993 MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Event Category
Part (P) PN 13636-94756-0394756.13 Ent=r Part Number
C/W
Hrs: 3601.0
Lnd: 1644
Date: 11 Dec 1998
Freq <javascript:op=nCustomFreq(3414842);>
SN
Mfg Ref Number: 71-01-00
Doc: GIVAMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="DocLinks" style="width: 180px; font-family: anal; font-si=e: 8pt;">DocumentsAMM 712061Task=20
Card <javascript:openComplmageLoaderc34148421> Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06=Dec 2012 13:31 Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumber=712067> OEM Labor Hours:4.0
Mx. Notes: FREQ DETERMINED BY P/N Special Notation: Show Related=Codes Show Part Detail=
S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value=3D"on">0ps Spec
Hours: Initial Frequency: N/A
Cycles: Recurring Frequency:<=font> N/A Next due was not adjusted. <=tr>
Date: Frequency Tolerance:<=font> N/A
9
EFTA_R1_01393793
EFTA02379927
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer: Install=20 Status: RB - RebuiltR - Repairedl - InspectedM - ModifiedN - NewO -
Overhauled Current Part Run Time: Hours Landings Months
TSN
TSO
TSR
Vendor:=nbsp; Mod Sta=us:
HW Vers=on: Part Warranty:
SW Vers=on: Labor=20 Warranty:
Maint T=g: Airframe Time =t Install
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours Cycles [ =onths or Date]
TSN: <javascript:doNothing();> </=> <javascript:doNothing();>
TSR: <javascript:doNothing();> atd>
New Cos=: $1,747.28
Overhau=ed:
Repaire=:
OEM Ven=or: BARRY CONTROLS AEROSPACE Install=20 Notes: ATA 712067 Compliance History
Part ON # Serial ON # CW Hrs CW Cyc CW Date Actual Cost Work Order #
Part OFF # Serial OFF # Remark / Malfunction Actual Labor Facility
ON : 94756-13 ON : 2993 3,601.0 1,644 11 Dec 1998 0.00 [view]
<javascript:openComplHistE=itor( '3414842', 4484068)>
<javascript:openCompHistImageLoader( '3414842',='4484068' ►>
OFF : 13636-94756-03 OFF: 0518 0.00 GAC-APP
ON : 13636-94756-03 ON : 0518 0.0 0 07 Dec 1988 0.00 [view]
<javascript:openComplHistE=itor( '3414842', 6381279)>
<javascript:openCompHistImageLoader( '3414842',='6381279' )>
0.00
=/div>
<https:=/cmp.mygulfstream.com/Images/minus.gif> 712068 (P) Airframe Vibration
Isolator (Right Aft Mount, Aft)=- Removal / Installation
P/N: 94756-13 S/N: 2994 MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> Part
Event Category
Part (P) PN 13636.94756.0394756.13 Ent=r Part Number
C/W
Hrs: 3601.0
Lnd: 1644
Date: 11 Dec 1998
10
EFTA_R1_01393794
EFTA02379928
Freq <javascript:op=nCustomFreq(3415890);>
SN
Mfg Ref Number: 71.01.00
Doc: GIVAMM Rev: =3 Issued: 3= Sep 2012
Section:
<=elect name="Doclinks" style="width: 180px; font-family: arial; font-si=e: 8pt;">DocumentsAMM 712061Task=20
Card <javascript:openComplmageLoader('3415890')> Watched Ops Package Last Upd=ted By: Rick Reynolds Date:
06=Dec 2012 13:34 Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumber=712068> OEM Labor Hours:4.0
Mx. Notes: Special Notation: Show Related=Codes Show Part Detail= S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value=3D"on">Ops Spec
Hours: Initial Frequency: N/A
Cycles: Recurring Frequency:<=font> N/A Next due was not adjusted. <=tr>
Date: Frequency Tolerance:<=font> N/A
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
tYPe="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden" value="1">
Part Details
Manufac=urer: Install=20 Status: RB - RebuiltR - Repairedl - InspectedM - ModifiedN - NewO -
Overhauled Current Part Run Time: Hours Landings Months
TSN
TSO
TSR
Vendor:=nbsp; Mod Sta=us:
HW Vers=on: Part Warranty:
SW Vers=on: Labor=20 Warranty:
Maint T=g: Airframe Time =t Install
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours Cycles I =onths or Date
TSN: <javascript:doNothing();> </=> <javascript:doNothing();>
TSR: <javascript:doNothing();> <=td>
New Cos=: $1,747.28
Overhau=ed:
Repaire=:
OEM Ven=or: BARRY CONTROLS AEROSPACE Install=20 Notes: ATA 712068 Compliance History
Part ON # Serial ON # CW Hrs CW Cyc CW Date Actual Cost Work Order #
Part OFF # Serial OFF # Remark / Malfunction Actual Labor Facility
ON : 94756.13 ON : 2994 3,601.0 1,644 11 Dec 1998 0.00 (view)
<javascript:openComplHistE=itor( '341589U, 3700147 )>
<javascript:openCompHistImageLoader( '3415890',='3700147' )>
OFF : 13636-94756-03 OFF: 0496 0.00 GAC-APP
11
EFTA_R1_01393795
EFTA02379929
ON : 13636-94756-03 ON : 0496 0.0 0 07 Dec 1988 0.00 (view)
<javascript:openComplHistE=itor( '3415890', 6087564)>
<javascript:openCompHistImageloader( '3415890',.'6087564' )>
0.00
=/div>
<https:=/cmp.mygulfstream.com/Images/minus.gif> 712069 (P) Airframe Engine
Vibration Isolator (Left) - Clean = Inspect / Repair 120 MOS (C)=/span>
Due: End Of Month
Custom Frequency
MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> 59 Mos
Event Category
Special Inspection (M) PN Enter Par= Number
C/W Used Due Remains
Hrs: 7178.6
Lnd: 3292
Date: 15 Dec 2008
MO= 31Dec 2018
59 Mos
Freq <javascript:op=nCustomFreq(3415308);> Next Due per Flight Utilization:&n=sp; 31 Dec 2018
SN
Mfg Ref Number: 71.01.00
Doc: R=v: =ssued: 01 Mar 1986
Section:
<=elect name="Doclinks" style="width: 180px; font-family: arial; font-si=e: 8pt;">DocumentsAMM 712069Task=20
Card <javascript:openComplmageLoader('3415308')> Watched Ops Package Last Upd=ted By: Martin Mroczek
Date: 1= Dec 2008 06:09 Est. =arts/Labor: $0.00/0.00 Hrs.
chttps://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumber=712069> OEM Labor Hours:16.0
Mx. Notes: Special Notation: Show Related=Codes No Part Information S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value=3D"on">Ops Spec
Hours: Initial Frequency: N/A
Cycles: Recurring Frequency:<=font> 120 MOS Next due was not adjusted. <=tr>
Date: Frequency Tolerance:<=font> N/A
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden">
Part Details
Manufac=urer: Install=20 Status: RB - RebuiltR - Repairedl - InspectedM - ModifiedN - NewO -
Overhauled Current Part Run Time: Hours Landings Months
TSN
ISO
TSR
12
EFTA_R1_01393796
EFTA02379930
Vendor:=nbsp; Mod Sta=us:
HW Vers=on: Part Warranty:
SW Vers=on: Labor=20 Warranty:
Maint T=g: Airframe Time =t Install
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours Cycles =onths or Date ]
TSN: = <javascript:doNothing();> </=> <javascript:doNothing();>
TSR: <javascript:doNothing();> atd>
New Cos=:
Overhau=ed:
Repaire=:
OEM Ven=or: Install=20 Notes: MAN <https://cmp.mygulfstream.com/images/dotGreen.=if> 59 Mos
Event Category
Special Inspection (M) PN Enter Par= Number
C/W Used Due Remains
Hrs: 7178.6
Lnd: 3292
Date: 15 Dec 2008
MO= 31Dec 2018
59 Mos
Freq <javascript:op=nCustomFreq(3416340);> Next Due per Flight Utilization:&n=sp; 31 Dec 2018
SN
Mfg Ref Number: 71-01-00
Doc: R=v: =ssued: 01 Mar 1986
Section:
<=elect name="DocLinks" style="width: 180px; font-family: arial; font-si=e: 8pt;">DocumentsAMM 712069Task=20
Card siavascript:openComplmageLoader('34163401)> Watched Ops Package Last Upd=ted By: Martin Mroczek
Date: 1= Dec 2008 06:09 Est. =arts/Labor: $0.00/0.00 Hrs.
<https://cmp.mygulfstream.com/C=mpliance/BudgetEstimate.aspx?ataNumber=712070> OEM Labor Hours:16.0
Mx. Notes: Special Notation: Show Related=Codes No Part Information S=ow C/W Adjustments
C/W Adjustments=/span>
=irframe Time used for Due Calculation =input name="opsSpec" id="opsSpec" type="checkbox" checked=""
value=3D"on">Ops Spec
Hours: Initial Frequency: N/A
Cycles: Recurring Frequency:<=font> 120 MOS Next due was not adjusted. <=tr>
Date: Frequency Tolerance:<=font> N/A
=input name="currentHoursComponent" type="hidden" value="8638.600"> <=nput name="currentCyclesComponent"
type="hidden" value="4005.000"> <=nput name="isPartRel" type="hidden">
Part Details
Manufac=urer: Install=20 Status: RB RebuiltR - Repairedl - InspectedM ModifiedN - NewO -
Overhauled Current Part Run Time: Hours Landings Months
TSN
ISO
13
EFTA_R1_01393797
EFTA02379931
TSR
Vendor:=nbsp; Mod Sta=us:
HW Vers=on: Part Warranty:
SW Vers=on: Labor=20 Warranty:
Maint T=g: Airframe Time =t Install
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours Cycles [ =onths or Date)
TSN: = <javascript:doNothing();> </=> <javascript:doNothing();>
TSR: <javascript:doNothing();> <=td>
New Cos=:
Overhau=ed:
Repaire=:
OEM Ven=or: Install=20 Notes: MA 712070 Compliance History
Part ON # Serial ON St CW Hrs CW Cyc CW Date Actual Cost Work Order #
Part OFF # Serial OFF St Remark / Malfunction Actual Labor Facility
7,178.6 3,292 15 Dec 2008 0.00 [view) <javascript:openComplHistE=itor( '3416340',
18903347)>
<javascript:openCompHistImageLoader( '3416340',='18903347' )>
0.00
3,601.0 1,644 11 Dec 1998 0.00 [view] <javascript:openComplHistEritor( '3416340',
2556375)>
<javascript:openCompHistImageLoader( '3416340',&2556375' )>
0.00 GAC-APP
1,020.0 413 05 Apr 1992 0.00 [view] <javascript:openComplHistE=itor( '3416340',
5682341)>
<javascript:openCompHistlmageloader( '3416340',='5682341' ►>
0.00
=/div>
712071 (P) Airframe Engine Isolator Mount Bolt Assembly (Left= Forward) - Scrap
P/N: 94756-07 S/N: 5302 8000 HRS</=pan>
Tolerance
+500 Hr Over Flight
MAN <https://cmp.mygulfstream.com/images/dotGree=.gif> 6540.0 Hrs
<=div>
712072 (P) Airframe Engine Isolator Mount Bolt Assembly (Righ=, Forward) - Scrap
P/N: 94756-07 S/N: 5319 8000 HRS</=pan>
Tolerance
+500 Hr Over Flight
MAN <https://cmp.mygulfstream.com/images/dotGree=.gif> 6540.0 Hrs
14
EFTA_R1_01393798
EFTA02379932
Event Category
Replacement (X) PN 94756-07' Enter Part Number
C/W Due Remains
Hrs: 7178.6
15178.6
6540.0
Lnd: 3292
Date: 15 Dec 2008
Freq <javascript:op=nCustomFreq(18270374);> Next Due per Flight Utilization:&n=sp; 31 Oct 2035
SN
Mfg Ref Number: 71.01.00
Doc: GIV AMM Rev: =4 Issued: 3= Apr 2013
Section: 05-02-00
<=elect name="Doclinks" style="width: 180px; font-family: arial; font-si=e: 8pt;">DocumentsAMM 712071Task=20
Card <javascript:openComplmageLoadert182703741)> Watched RII
Est. =arts/Labor: $0.00/0.00 Hrs. OEM Labor Hours:0.0
Mx. Notes: compliance transfered from code 712018 Special Notation: Ops Spec
Hours: Initial Frequency: N/A
Cycles: Recurring Frequency:afont> 8000 Hrs Next due was not adjusted. <=tr>
Date: Frequency Tolerance:<=font> +500 Hr Over Flight </=ont>
= =input name="currentCyclesComponent" type="hidden" value="4005.000"> =input name="isPartRel" type="hidden"
value="1"> S ServiceableTC - Time Continuedl - InspectedM - ModifiedN - NewO - Overhauled Current Part Run Time:
Hours Landings Months
TSN
ISO
TSR
Vendor:=nbsp; Mod Sta=us:
HW Vers=on: Part Warranty:
SW Vers=on: Labor=20 Warranty:
Maint T=g: Airframe Time =t Install
Hours:
Cycles:
Date:
Part Time at=20 Install
Hours Cycles i=onths or Date]
TSN: <javascript:doNothing();> </=> <javascript:doNothing();>
TSR: <javascript:doNothing();> atd>
New Cos=: $635.64
Overhau=ed:
Repaire=:
OEM Ven=or: BARRY CONTROLS AEROSPACE Install=20 Notes:
Vendor =D: V000020996
Compliance Remarks
FOR REFERENCE ONLY
P/N 94756-07. Not to exceed 8500 hours. Reco=mended at scheduled engine overhaul.
15
EFTA_R1_01393799
EFTA02379933
ℹ️ Document Details
SHA-256
b2dfd7107259b4ce0036b34b11d8b4a0f6a5b35c1aa72ba9e02c47a324543d45
Bates Number
EFTA02379919
Dataset
DataSet-11
Document Type
document
Pages
15
Comments 0