EFTA02005377
EFTA02005379 DataSet-10
EFTA02005380

EFTA02005379.pdf

DataSet-10 1 page 223 words document
V16 P17 P23 P19
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (223 words)
To: jeevacationftmail.com[jeeyacation©gmaitcom]; Jeffrey Epsteinbeeyacation©gmail.corn] From: Zorro Ranch Sent Tue 8/21/2012 2:06:31 PM Subject Fwd: Drilling Update Will get cost for compressor Recommend going to 800 and Then do air lift to get a basic idea of yield This is drillers approach as well Sent from my iPhone Begin forwarded message: From: Casey Cook Date: August 20, 2012 6:5J/IIII I” To: brice gordon Subject: Drilling Brice G.; As we discussed, the drill crew reached 640 ft in the exploratory borehole tonight with no observations of significant fluid loss. The driller has indicated he may be able to switch to an airlift operation without damaging the borehole, which will allow a preview of the how much water is coming from the hole. The operation will require an additional compressor that will add to the drilling cost, but it may be the only way to see how much water this hole can produce. With your approval, I will direct the drillers to set up for an air operation. I have a call into Ronnie Dennison at HGS to discuss the logistics and schedule for making the transition to air. I will let you know what he says. Please call to discuss any of this. Casey W. Cook, P.E. Belleau Groundwater, Inc. 901 Rio Grande Blvd. NW Suite F-242 Albuanwmnw. NM 87104 www. a eau.com EFTA_R1_00504179 EFTA02005379
ℹ️ Document Details
SHA-256
b37597009215dd578d824cc07bab79ef146ad79759a96232ec1ba6ca1c7a2440
Bates Number
EFTA02005379
Dataset
DataSet-10
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!