From: jeffrey E. <[email protected]>
Sent: Friday, May 29, 2015 1:29 PM
To: Ann Rodriquez
Subject: Re: LS1 Big N progress
ask him if he thinks we should replace the cores. engines=C240 etc
On Fri, May 29, 2015 at 9:26 AM, Ann Rodriquez wrote:
<=r>
Ann R.
Begin forwarded message:
From: gene kral mailto:g
=b>Date: May 29, 2015 at 9:23:19 AM AST
To: Ann Rodriquez < <mailto:
Subject: L.51 progress
Reply-To:rgene kral < <mailtc
Good Morning Ann
Work is progressing as planned. Today, w= will be finished with pressure washing the engine room;we
removed all flo=r plates, scraped off oil degreased sides and overhead. Additional work we=will not charge for will be: 1)
adding supports under the hatch =where it was; 2) modify to accommodate your control tower. This area =as not
thought out very well and allowed sea and rain water to =eak on rear of engines causing rust and corrosion. We will
also repa=r several deck fitting that were compromised and allowed the elements into=engine room. We are also going
to renew most of the aluminum floor pa=els with no extra charge.
Electrical work is progressing and new engine gauges are installed=
New engine exhaust is progressing using all ne= using 316-L stainless steel; one new muffler is in place .
EFTA_R1_01625954
EFTA02499530
Existing Hydraulic system is removed in it entirety and a new syst=m is being designed.
New receiver tank is fabricated=and waiting for installation
Stbd fuel tank is opene= and fuel drained and tank cleaned. Port side is now being worked on.
Rudders have new flanges and are now set on the welding t=ble for reinstallation .
Engine alignment is beginni=g and new cutless bearing will be installed next week; couplings are in th=
machine shop to be resurfaced.
(Si will be in the yard for another 4 to S weeks.
I would like to take this time to revie= the engines. No one has been here servicing engines and we are
at the poi=t that another person coming here will be in the way. From what I have bee= told, the valve covers need new
gaskets (4) and the starters need a inspe=tion, new air filters, and cleaning of engines so a primer/topcoat can be
=pplied. New fuel lines and new plumbing for heat exchangers.
Remember this was something not quoted=on.. If you want us to make these improvements, I would
quote a additional=8K total.
If you don't want to take this extra c=arge on now, I would advise to wait until we are complete so we
are not in=each other's way.
Tha=ks
Gene
Gene Kral Sr.
Subbase Drydock, In=.
Parcel 162, Subbase
St. Thomas, USVI 00802
TEL:
FAX: (340) 779-8426 <tel:%28340%29%20779-8426>
www.subbasedrydock.com <http://www.subbasedr=dock.com>
=it:Ey>
=C241 please note
The information contained in t=is communication is
confidential, may be attorney-client privileged, ma=
constitute inside information, and is intended only for
the use of =he addressee. It is the property of
JEE
Unauthorized use, disclosure=or copying of this
communication or any part thereof is strictly prohib=ted
and may be unlawful. If you have received this
communication in =rror, please notify us immediately by
return e-mail or by e-mail to [email protected]=m, and
destroy this communication and all copies thereof,
includ=ng all attachments. copyright -all rights reserved
2
EFTA_R1_01625955
EFTA02499531
ℹ️ Document Details
SHA-256
b4210308c085ca1e6376eb1c565887cb2236772ff6154028c361848b20f67897
Bates Number
EFTA02499530
Dataset
DataSet-11
Type
document
Pages
2
💬 Comments 0