EFTA02400190.pdf

DataSet-11 2 pages 237 words document
P23
👁 1 💬 0
📄 Extracted Text (237 words)
From: Ann Rodriquez Sent: Thursday, May 12, 2016 11:31 PM To: Jeffrey Subject: GSJ Bathrooms Hey Bossman, Mr. Luciano bid (<=pan style="background-color: rgba(255, 255, 255, 0);">$15,473.00) </=pan>to do all the Bathrooms in ceramic tiles. I'm still waiting on a=Quote from Mr. Dia Villa. Ann R. Begin forwarded message: =div>From: lemmond luciano Date: May 12, 2016 at 7:26:47=PM AST To: Ann Rodriquez < Subject: Re: LSJ: Anna=br> <=iv> <=div> &nb=p; &=bsp; mast=r bathroom (1) remove all existing w=ll and shower tile (2) replace gypsum board =div> (3) install new gypsum boar and durock in shower wall (4) install 300 sqf of ceramic tile in wall and showe= floor &=bsp; =nbsp; &nbs=; total &n=sp; =nbsp; &nbs=; &n=sp; =nbsp; $ 6=525 &nbs=; &n=sp; bathroom 2 (1)revove bathroom floor tile (2) install n=w durock in showr floor (3) install 228 sqf of cer=mic tile in walls and bathroom floor EFTA_R1_01435454 EFTA02400190 &=bsp; • &nb=p; total labor&=bsp; • &nb=p; &=bsp; =$ 4,474 =nbsp; &nbs=; &n=sp; =nbsp; &nbs=; &n=sp; bathroom 3 (1) rem=ve bathrrom floor tile (2)&nb=p; install new durock in shower floor (3) install 228 sqf of ceramic tile in walls and bathsroom floor&nb=p; &nb=p; &=bsp; total labor = &nb=p; &=bsp; $ 4,474 <=r> &n=sp; =nbsp; grand total &nbs=; &n=sp; =nbsp; &nbs=; &n=sp; 15,4=3 &=bsp; On Thu, May 12,=2016 at 5:23 PM, Ann Rodriquez <mailto: > w=ote: Hi Luciano, Please reply with quote. Hopefully this will work. Ann R. 2 EFTA_R1_01435455 EFTA02400191
ℹ️ Document Details
SHA-256
b5b6558c10eaa5f2a8a65e44ce40ce6e826217c1c0a92ad947577e66265538d2
Bates Number
EFTA02400190
Dataset
DataSet-11
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!